Archaeological Survey and Evaluation of Structural Components of the Roosevelt Power Canal, Color Slides Part 2
Part of the Archaeological Survey and Evaluation of Structural Components of the Roosevelt Power Canal project
Creator(s): Archaeological Research Services, Inc.
Year: 1983
Summary
Color slides of power canal components, images # 51-100. PC # stands for the ARS component. Table with list of component descriptions corresponding to these images found in the survey and evaluation report on pages 13 - 18.
This report is located in the tDAR resource: https://core.tdar.org/document/437988/archaeological-survey-and-evaluation-of-structural-components-of-the-roosevelt-power-canal
Cite this Record
Archaeological Survey and Evaluation of Structural Components of the Roosevelt Power Canal, Color Slides Part 2. Archaeological Research Services, Inc.. Tempe, AZ: Archaeological Research Services, Inc. ( tDAR id: 437991) ; doi:10.6067/XCV8437991
Keywords
Culture
Historic
Material
Building Materials
Site Name
Roosevelt Power Canal
Site Type
Agricultural or Herding
•
Bridge
•
Canal or Canal Feature
•
Concrete Slab
•
Culvert
•
Dam
•
Diversion Dam
•
Flume
•
Resource Extraction / Production / Transportation Structure or Features
•
Road, Trail, and Related Structures or Features
•
siphon
•
Sluice Gate
•
Tunnel
•
Water Control Feature
•
Weir
Investigation Types
Architectural Survey
•
Historic Background Research
•
Site Evaluation / Testing
•
Systematic Survey
General
Roosevelt Power Canal
•
Salt River Project
•
SRP
Geographic Keywords
04007 (Fips Code)
•
Apache Trail
•
Arizona (State / Territory)
•
Pinto Creek
•
Schoolhouse Wash
•
Theodore Roosevelt Dam
•
Theodore Roosevelt Lake
•
Tonto National Forest
Temporal Keywords
1900s
•
20th Century
•
Early 20th Century
•
Historic Period
•
Mid 20th Century
Temporal Coverage
Calendar Date: 1906 to 1952 (Use history and operation of Roosevelt Power Canal)
Calendar Date: 1902 to 1904 (Feasibility assessment and survey of Roosevelt Power Canal))
Calendar Date: 1904 to 1906 (Initial construction of Roosevelt Power Canal)
Spatial Coverage
min long: -111.165; min lat: 33.618 ; max long: -110.912; max lat: 33.681 ;
Individual & Institutional Roles
Contact(s): Salt River Project Cultural Resource Manager
Contributor(s): James E. Ayres; U.S. Bureau of Reclamation
Landowner(s): Tonto National Forest
Sponsor(s): Salt River Project
Prepared By(s): Archaeological Research Services, Inc.
Submitted To(s): Salt River Project
Record Identifiers
NADB document id number(s): 1000066
SRP Library Barcode No.(s): 00030576
NADB citation id number(s): 000000012068
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
IMG051.jpg | 3.35mb | Sep 7, 2017 1:45:56 PM | Confidential | ||
PC 42 - Pinto Siphon, exit gates. | |||||
IMG052.jpg | 2.90mb | Sep 7, 2017 1:45:56 PM | Confidential | ||
PC 42 - Pinto Siphon, exit gates. | |||||
IMG053.jpg | 2.93mb | Sep 7, 2017 1:45:56 PM | Confidential | ||
PC 42 - Pinto Siphon, exit gates. | |||||
IMG054.jpg | 2.83mb | Sep 7, 2017 1:45:56 PM | Confidential | ||
PC 43 - Pinto tunnel, 999'. | |||||
IMG055.jpg | 2.86mb | Sep 7, 2017 1:45:57 PM | Confidential | ||
PC 43 - View of Pinto tunnel entry, 999'; Looking West. | |||||
IMG056.jpg | 4.60mb | Sep 7, 2017 1:45:57 PM | Confidential | ||
PC 44 - 60" drainage flume. | |||||
IMG057.jpg | 3.50mb | Sep 7, 2017 1:45:57 PM | Confidential | ||
PC 44 - View of a 60" drainage flume, looking South. | |||||
IMG058.jpg | 3.73mb | Sep 7, 2017 1:45:57 PM | Confidential | ||
PC 44A - Bridge. | |||||
IMG059.jpg | 2.89mb | Sep 7, 2017 1:45:57 PM | Confidential | ||
PC 45 - View of 11' 6" arch culvert and overflow weir, looking East. | |||||
IMG060.jpg | 3.80mb | Sep 7, 2017 1:45:58 PM | Confidential | ||
PC 46 - Bridge. | |||||
IMG061.jpg | 4.43mb | Sep 7, 2017 1:45:58 PM | Confidential | ||
PC 47 - 16" pipe culvert. | |||||
IMG062.jpg | 3.50mb | Sep 7, 2017 1:45:58 PM | Confidential | ||
PC 51 - 16" pipe culvert. | |||||
IMG063.jpg | 3.48mb | Sep 7, 2017 1:45:58 PM | Confidential | ||
PC 50 - 30" double pipe culvert. | |||||
IMG064.jpg | 3.90mb | Sep 7, 2017 1:45:58 PM | Confidential | ||
PC 52 - 16" pipe culvert. | |||||
IMG065.jpg | 3.11mb | Sep 7, 2017 1:45:59 PM | Confidential | ||
PC 53 - 3' arch culvert. | |||||
IMG066.jpg | 3.90mb | Sep 7, 2017 1:45:59 PM | Confidential | ||
PC 54 - Bridge. | |||||
IMG067.jpg | 3.27mb | Sep 7, 2017 1:45:59 PM | Confidential | ||
PC 54 - Chilton Tunnel, 1026' & Bridge. | |||||
IMG068.jpg | 3.50mb | Sep 7, 2017 1:45:59 PM | Confidential | ||
PC 54 - View of overflow weir with I-Beams, ARS-54, looking East. | |||||
IMG069.jpg | 3.74mb | Sep 7, 2017 1:46:00 PM | Confidential | ||
PC 54 - Chilton Tunnel, 1026' & bridge, Flume & overflow weir at west end. | |||||
IMG070.jpg | 3.34mb | Sep 7, 2017 1:46:00 PM | Confidential | ||
PC 55 - View of a single 16" pipe culvert, ARS-55, looking South. | |||||
IMG071.jpg | 3.51mb | Sep 7, 2017 1:46:00 PM | Confidential | ||
PC 55 - 16" pipe culvert. | |||||
IMG072.jpg | 3.51mb | Sep 7, 2017 1:46:00 PM | Confidential | ||
PC 58 - 72" drainage flume and bridge. | |||||
IMG073.jpg | 3.53mb | Sep 7, 2017 1:46:00 PM | Confidential | ||
PC 58 - 72" drainage flume and bridge. | |||||
IMG074.jpg | 5.97mb | Sep 7, 2017 1:46:01 PM | Confidential | ||
PC 59 - Robinson tunnel, 151'. | |||||
IMG075.jpg | 4.13mb | Sep 7, 2017 1:46:01 PM | Confidential | ||
PC 60 - 84" drainage flume and bridge. | |||||
IMG076.jpg | 3.74mb | Sep 7, 2017 1:46:01 PM | Confidential | ||
PC 61 - 90" drainage flume and bridge. | |||||
IMG077.jpg | 4.30mb | Sep 7, 2017 1:46:01 PM | Confidential | ||
PC 62 - 24" pipe culvert. | |||||
IMG078.jpg | 4.78mb | Sep 7, 2017 1:46:02 PM | Confidential | ||
PC 63 - 48" drainage flume and bridge. | |||||
IMG079.jpg | 4.21mb | Sep 7, 2017 1:46:02 PM | Confidential | ||
PC 64 - Grey tunnel 761'. | |||||
IMG080.jpg | 3.49mb | Sep 7, 2017 1:46:02 PM | Confidential | ||
PC 65 - 5' arch culvert. | |||||
IMG081.jpg | 4.18mb | Sep 7, 2017 1:46:02 PM | Confidential | ||
PC 66 - 5' arch culvert. | |||||
IMG082.jpg | 4.51mb | Sep 7, 2017 1:46:02 PM | Confidential | ||
PC 67 - 48" drainage flume and bridge. | |||||
IMG083.jpg | 4.08mb | Sep 7, 2017 1:46:03 PM | Confidential | ||
PC 68 - Moffat tunnel, 213'. | |||||
IMG084.jpg | 3.58mb | Sep 7, 2017 1:46:03 PM | Confidential | ||
PC 69 - 4' arch culvert. | |||||
IMG085.jpg | 3.29mb | Sep 7, 2017 1:46:03 PM | Confidential | ||
PC 72 - Grapevine tunnel, 872'. | |||||
IMG086.jpg | 2.98mb | Sep 7, 2017 1:46:03 PM | Confidential | ||
PC 73 - 11' 6" double arch culvert. | |||||
IMG087.jpg | 5.25mb | Sep 7, 2017 1:46:03 PM | Confidential | ||
PC 74 - 30" drainage flume. | |||||
IMG088.jpg | 3.90mb | Sep 7, 2017 1:46:03 PM | Confidential | ||
PC 75 - Overflow weir. | |||||
IMG089.jpg | 3.27mb | Sep 7, 2017 1:46:03 PM | Confidential | ||
PC 76 - Two sluice gates. | |||||
IMG090.jpg | 3.43mb | Sep 7, 2017 1:46:04 PM | Confidential | ||
PC 76 - Two sluice gates. | |||||
IMG091.jpg | 3.78mb | Sep 7, 2017 1:46:04 PM | Confidential | ||
PC 79 - 8' arch culvert. | |||||
IMG092.jpg | 3.50mb | Sep 7, 2017 1:46:04 PM | Confidential | ||
PC 80 - 4' arch culvert. | |||||
IMG093.jpg | 3.19mb | Sep 7, 2017 1:46:04 PM | Confidential | ||
PC 83 - 8' arch culvert. | |||||
IMG094.jpg | 3.28mb | Sep 7, 2017 1:46:04 PM | Confidential | ||
PC 84 - 93' cut and cover. | |||||
IMG095.jpg | 3.42mb | Sep 7, 2017 1:46:04 PM | Confidential | ||
PC 84 - View of siphon entry, Schoolhouse Wash, ARS-84, looking West. 93' cut and cover. | |||||
IMG096.jpg | 3.42mb | Sep 7, 2017 1:46:05 PM | Confidential | ||
PC 85 - 30" drainage flume and bridge. | |||||
IMG097.jpg | 3.74mb | Sep 7, 2017 1:46:05 PM | Confidential | ||
PC 86 - Tunnel, 206'. | |||||
IMG098.jpg | 3.58mb | Sep 7, 2017 1:46:05 PM | Confidential | ||
PC 88 - 4' arch culvert. | |||||
IMG099.jpg | 3.21mb | Sep 7, 2017 1:46:05 PM | Confidential | ||
PC 89 - Tunnel, 341'. | |||||
IMG100.jpg | 4.21mb | Sep 7, 2017 1:46:06 PM | Confidential | ||
PC 90 - 48" drainage flume and bridge. |
Accessing Restricted Files
At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below
Contact(s): Salt River Project Cultural Resource Manager