AZ AA:3:22(ASM) (Site Name Keyword)
1-15 (15 Records)
As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. To assist with project planning, Reclamation directed Archaeological Consulting Services, Ltd. (ACS)...
Class I (Overview) Survey Update of the San Carlos Irrigation Drainage District (SCIDD) Joint Works for the U.S. Bureau of Reclamation, Pinal County, Arizona: Photo (2009)
As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. To assist with project planning, Reclamation directed Archaeological Consulting Services, Ltd. (ACS)...
Class I (Overview) Survey Update of the San Carlos Irrigation Drainage District (SCIDD) Joint Works for the U.S. Bureau of Reclamation, Pinal County, Arizona: Report (2009)
As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. To assist with project planning, Reclamation directed Archaeological Consulting Services, Ltd. (ACS)...
A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation
The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...
A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation: Report (1995)
The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...
Cultural Resources Assessment of 28 Archaeological Sites Located Along Reach 4 of the Fannin-McFarland Portion of the CAP Canal
The Bureau of Reclamation has developed an archaeological site database for the Central Arizona Project (CAP) canal main stem based on the Class III survey data that includes all previously recorded sites. An unknown number of these sites were either destroyed by construction or excavation, while others are no longer located within the CAP right-of-way (ROW). To assist Reclamation in checking the accuracy of its site database, Archaeological Consulting Services, Ltd. (ACS) was asked to revisit...
Cultural Resources Assessment of 28 Archaeological Sites Located Along Reach 4 of the Fannin-McFarland Portion of the CAP Canal (2009)
The Bureau of Reclamation has developed an archaeological site database for the Central Arizona Project (CAP) canal main stem based on the Class III survey data that includes all previously recorded sites. An unknown number of these sites were either destroyed by construction or excavation, while others are no longer located within the CAP right-of-way (ROW). To assist Reclamation in checking the accuracy of its site database, Archaeological Consulting Services, Ltd. (ACS) was asked to revisit...
Hohokam Archaeology along the Salt-Gila Aqueduct Central Arizona Project, Volume I: Research Design (1982)
This volume is the first in a series of publications associated with the Salt-Gila Aqueduct Archaeological Data Collection Studies and Supplemental Class 3 Survey Project (SGA). The project focuses principally upon data recovery at those sites potentially subject to impact as a consequence of Central Arizona Project construction along a route extending 97 km from a point south of Apache Junction, Arizona, to the Picacho Reservoir. This initial volume incorporates the results of test excavations...
Hohokam Archaeology along the Salt-Gila Aqueduct Central Arizona Project, Volume III: Specialized Activity Sites (1983)
This volume is the third in a nine volume series reporting the results of archaeological investigations conducted along the right-of-way of the Salt-Gila Aqueduct. The aqueduct, under construction by the U.S. Bureau of Reclamation (USBR), is part of the Central Arizona Project. The emphasis of this volume is directed toward specialized activity sites, most of which relate to wild plant or lithic processing or agriculture. All are located along Reaches 1 through 4 of the aqueduct, from just south...
Hohokam Archaeology along the Salt-Gila Aqueduct Central Arizona Project, Volume IX: Synthesis and Conclusions (1984)
This volume is the last in a series of nine reporting the work of the Salt-Gila Aqueduct, Central Arizona Project Archaeological Data Collection Studies and Supplemental Class 3 Survey Project (SGA). This study was funded by the U.S. Bureau of Reclamation (Contract No. 0-0732- V0101) to mitigate potential adverse impacts of Central Arizona Project construction on cultural resources in the aqueduct right-of-way. Data recovery was conducted at 45 Hohokam sites along a 93 km (58 mile) transect...
Hohokam Archaeology along the Salt-Gila Aqueduct Central Arizona Project, Volume VII: Environment and Subsistence (1984)
This is the seventh volume of a nine-volume series reporting archaeological investigations in south-central Arizona along the SaltGila Aqueduct (SGA), conducted for the U.S. Bureau of Reclamation (USBR) under Contract No. 0-07-32-V0101. The SGA is a 58-mile-Iong component of the Central Arizona Project that begins east of Phoenix and extends to the vicinity of the Picacho Mountains. During the course of the analyses presented in this volume, it became apparent that any attempt to approach...
Hohokam Archaeology along the Salt-Gila Aqueduct Central Arizona Project, Volume VIII: Material Culture (1984)
This is the eighth volume of a nine-volume series reporting archaeological investigations in south-central Arizona along the SaltGila Aqueduct (SGA), conducted for the U.S. Bureau of Reclamation (USBR) under Contract No. 0-07-32-V0101. The SGA is a 58-mile-Iong component of the Central Arizona Project that begins east of Phoenix and extends to the vicinity of the Picacho Mountains. Specialized analyses of artifacts recovered from 45 sites excavated along the SGA are reported in this volume. The...
Photolog for Photos from the Cultural Resources Assessment of 28 Archaeological Sites Located Along Reach 4 of the Fannin-McFarland Portion of the CAP Canal (2009)
The Bureau of Reclamation has developed an archaeological site database for the Central Arizona Project (CAP) canal main stem based on the Class III survey data that includes all previously recorded sites. An unknown number of these sites were either destroyed by construction or excavation, while others are no longer located within the CAP right-of-way (ROW). To assist Reclamation in checking the accuracy of its site database, Archaeological Consulting Services, Ltd. (ACS) was asked to revisit...
Photos from the Cultural Resources Assessment of 28 Archaeological Sites Located Along Reach 4 of the Fannin-McFarland Portion of the CAP Canal (2009)
The Bureau of Reclamation has developed an archaeological site database for the Central Arizona Project (CAP) canal main stem based on the Class III survey data that includes all previously recorded sites. An unknown number of these sites were either destroyed by construction or excavation, while others are no longer located within the CAP right-of-way (ROW). To assist Reclamation in checking the accuracy of its site database, Archaeological Consulting Services, Ltd. (ACS) was asked to revisit...
Salt-Gila Aqueduct (Fannin-McFarland Aqueduct) Archaeological Data Collection Studies and Supplemental Class III Survey Project
This project presents a series of publications associated with the Salt-Gila Aqueduct Archaeological Data Collection Studies and Supplemental Class III Survey Project (SGA). The research focused on data recovery at those sites potentially subject to impact as a consequence of Central Arizona Project construction. Salt-Gila Aqueduct Central Arizona Project construction occured along a route extending 97 km from a point south of Apache Junction, Arizona, to the Picacho Reservoir. Significant...