Water Control Feature (Site Type Keyword)
Parent: Agricultural or Herding
A device which controls the flow of water, particularly run-off. Includes check dams, flumes, gabions, head gates, drop structures, and riprap.
126-150 (504 Records)
Salt River Project (SRP) maintains a 69-kilovolt (kV) transmission line between the Glenbrook substation in Fountain Hills and the Rio Verde substation in the community of Rio Verde in Maricopa County, Arizona. The transmission line is currently supported by 30-year-old wooden poles, which generally follow the alignment of McDowell Mountain Road. In order to improve the overall safety and durability of the transmission line, SRP intends to replace all of the wooden poles with sturdier steel...
A Cultural Resource Survey of Reach 11 of the Granite Reef Aqueduct, Central Arizona Project (1978)
Under contract with the Bureau of Reclamation, the Office of Cultural Resource Management (OCRM), Department of Anthropology, Arizona State University, completed an archaeological survey of undisturbed portions of Reach 11 and its associated recreation areas. Reach 11 was previously surveyed in 1969 (Dittert et al. 1969) and 1972 (Kemrer et al. 1972), and one site (AZ U:5:13) was mitigated prior to construction (Reynolds 1974). The majority of Reach 11 had already been constructed when this...
A Cultural Resource Survey Report and Archaeological Monitoring and Discovery Plan for the Salt River Project 69-kV Transmission Line Pole Replacement Between Rio Verde and Fountain Hills, Maricopa County, Arizona (2005)
Salt River Project (SRP) maintains a 69-kilovolt (kV) transmission line between the Glenbrook substation in Fountain Hills and the Rio Verde substation in the community of Rio Verde in Maricopa County, Arizona (Figure 1). The transmission line is currently supported by 30-year-old wooden poles, which generally follow the alignment of McDowell Mountain Road. In order to improve the overall safety and durability of the transmission line, SRP intends to replace all of...
A Cultural Resource Survey Report of 204 Acres along for the Northern Parkway, near El Mirage, Maricopa County, Arizona (2012)
MCDOT plans to expand and extend Northern Parkway to be a parkway with grade-separated intersections at major cross streets to eliminate traffic signals and provide a higher-speed, higher-capacity, east-west route in the northwestern portion of the Phoenix metropolitan area where no freeways are planned. The current cultural resources assessment is in support of the Northern Parkway construction project, including geotechnical investigations. Before ground disturbance can begin, pursuant to the...
Cultural Resource Survey, Water Control Structure Repair at Smoots Pond, Fort A.P. Hill (AP2012.001)
The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed a cultural resource survey in association with the repair of a water control structure located on Smoots Pond at Fort A.P. Hill, Caroline County, Virginia. The proposed undertaking will include the placement of a temporary cofferdam, the removal of all metal and wooden gate elements, and the installation of stacked, removable aluminum...
Cultural Resource Survey, Water Control Structure Repair at Smoots Pond, Fort A.P. Hill, Caroline County, Virginia (2007)
The Fort A.P. Hill Cultural Resource Manager, under the Environmental Division of the Directorate of Public Works within Fort A.P. Hill, Virginia, has completed a cultural resource survey in association with the repair of a water control structure located on Smoots Pond at Fort A.P. Hill, Caroline County, Virginia. The proposed undertaking will include the placement of a temporary cofferdam, the removal of all metal and wooden gate elements, and the installation of stacked, removable aluminum...
Cultural Resources Assessment of 117 Archaeological Sites for the Fannin-McFarland and Tucson Aqueducts, Central Arizona Project Canal, Maricopa, Pinal, and Pima Counties, Arizona
In compliance with Section 106 of the NHPA, the Bureau of Reclamation (Reclamation), Phoenix Area Office (PXAO) began cultural resource surveys along the Central Arizona Project (CAP) main stem alignment shortly after the CAP was authorized. For the next 25 years, various cultural resource management contractors conducted inventories of the CAP, recording several hundred archaeological sites. From the 1970s to the 1980s, some of these sites were tested and/or excavated as mitigation for the...
Cultural Resources Assessment of 117 Archaeological Sites for the Fannin-McFarland and Tucson Aqueducts, Central Arizona Project Canal: Artifact Inventory and Analysis (2017)
ACS conducted testing at 10 sites within Reclamation’s CAP ROW seeking to resolve the National Register of Historic Places (Register) eligibility status of sites within the CAP ROW. This document presents the results of that testing. This file includes the artifact inventory and analysis collected during this project.
Cultural Resources Assessment of 117 Archaeological Sites for the Fannin-McFarland and Tucson Aqueducts, Central Arizona Project Canal: Photo Log (2017)
In compliance with Section 106 of the NHPA, the Bureau of Reclamation (Reclamation), Phoenix Area Office (PXAO) began cultural resource surveys along the Central Arizona Project (CAP) main stem alignment shortly after the CAP was authorized. For the next 25 years, various cultural resource management contractors conducted inventories of the CAP, recording several hundred archaeological sites. From the 1970s to the 1980s, some of these sites were tested and/or excavated as mitigation for the...
Cultural Resources Assessment of 117 Archaeological Sites for the Fannin-McFarland and Tucson Aqueducts, Central Arizona Project Canal: Photos (2017)
In compliance with Section 106 of the NHPA, the Bureau of Reclamation (Reclamation), Phoenix Area Office (PXAO) began cultural resource surveys along the Central Arizona Project (CAP) main stem alignment shortly after the CAP was authorized. For the next 25 years, various cultural resource management contractors conducted inventories of the CAP, recording several hundred archaeological sites. From the 1970s to the 1980s, some of these sites were tested and/or excavated as mitigation for the...
Cultural Resources Assessment of 117 Archaeological Sites for the Fannin-McFarland and Tucson Aqueducts, Central Arizona Project Canal: Project Area Shapefiles (2017)
In compliance with Section 106 of the NHPA, the Bureau of Reclamation (Reclamation), Phoenix Area Office (PXAO) began cultural resource surveys along the Central Arizona Project (CAP) main stem alignment shortly after the CAP was authorized. For the next 25 years, various cultural resource management contractors conducted inventories of the CAP, recording several hundred archaeological sites. From the 1970s to the 1980s, some of these sites were tested and/or excavated as mitigation for the...
Cultural Resources Assessment of 117 Archaeological Sites for the Fannin-McFarland and Tucson Aqueducts, Central Arizona Project Canal: Site Boundary Shapefiles (2017)
In compliance with Section 106 of the NHPA, the Bureau of Reclamation (Reclamation), Phoenix Area Office (PXAO) began cultural resource surveys along the Central Arizona Project (CAP) main stem alignment shortly after the CAP was authorized. For the next 25 years, various cultural resource management contractors conducted inventories of the CAP, recording several hundred archaeological sites. From the 1970s to the 1980s, some of these sites were tested and/or excavated as mitigation for the...
Cultural Resources Assessment of 117 Archaeological Sites for the Fannin-McFarland and Tucson Aqueducts, Central Arizona Project Canal: Units Summary (2017)
ACS conducted testing at 10 sites within Reclamation’s CAP ROW seeking to resolve the National Register of Historic Places (Register) eligibility status of sites within the CAP ROW. This document presents the results of that testing. This file includes the units summary collected during this project.
A Cultural Resources Assessment of Potential Routes for the Salt River Project's Proposed 230 kV Electric Transmission Line in District 4 of the Gila River Indian Community, Maricopa and Pinal Counties, Arizona (2013)
This report presents the results of a Cultural Resources Assessment (Class I Records Search, with limited supplemental fieldwork) by the Gila River Indian Community (GRIC) Cultural Resource Management Program (CRMP) for the proposed construction of a 230 kV electric transmission line in District 4 of the GRIC, Maricopa and Pinal Counties, Arizona (CRMP Project No. 2012.36x0). Implementation of the proposed undertaking will require approval from the Bureau of Indian Affairs (BIA), Pima Agency....
Cultural Resources Extent Testing of 7.13 Acres within the Prehistoric Site of Lombeye Ruin (AZ T:12:109 [ASM]), Phoenix, Maricopa County, Arizona (2006)
Northland Research, Inc. (Northland) has completed archaeological testing within a portion of Lombeye Ruin (AZ T:12:109[ASM]), a large Hohokam habitation site located along the Salt River in Phoenix, Arizona.The work was conducted for Cherokee Partners, L.L.C. prior to the planned development of the property and in accordance with City of Phoenix Preservation Ordinance, Section 802(A.1), the Arizona Antiquities Act, and A.R.S.§ 41-865. The purpose of the testing was to determine the nature and...
Cultural Resources Investigations along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Florence, Arizona
In accordance with the provisions of the 2004 Arizona Water Settlement Act, the Bureau of Reclamation, Phoenix Area Office (PXAO) assisted the San Carlos Irrigation and Drainage District (SCIDD) in the preparation of an environmental assessment (EA) prior to the rehabilitation of portions of the San Carlos Irrigation Project, a Bureau of Indian Affairs water delivery system that serves both the Gila River Indian Community and SCIDD. The project area extends along the current and realigned...
Cultural Resources Investigations along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Florence, Arizona: Artifact Analysis Data (2022)
In accordance with the provisions of the 2004 Arizona Water Settlement Act, the Bureau of Reclamation, Phoenix Area Office (PXAO) assisted the San Carlos Irrigation and Drainage District (SCIDD) in the preparation of an environmental assessment (EA) prior to the rehabilitation of portions of the San Carlos Irrigation Project, a Bureau of Indian Affairs water delivery system that serves both the Gila River Indian Community and SCIDD. The project area extends along the current and realigned...
Cultural Resources Investigations along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Florence, Arizona: Photo Log and Contact Sheets (2022)
n accordance with the provisions of the 2004 Arizona Water Settlement Act, the Bureau of Reclamation, Phoenix Area Office (PXAO) assisted the San Carlos Irrigation and Drainage District (SCIDD) in the preparation of an environmental assessment (EA) prior to the rehabilitation of portions of the San Carlos Irrigation Project, a Bureau of Indian Affairs water delivery system that serves both the Gila River Indian Community and SCIDD. The project area extends along the current and realigned...
Cultural Resources Investigations along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Florence, Arizona: Project Area Shapefiles (2022)
In accordance with the provisions of the 2004 Arizona Water Settlement Act, the Bureau of Reclamation, Phoenix Area Office (PXAO) assisted the San Carlos Irrigation and Drainage District (SCIDD) in the preparation of an environmental assessment (EA) prior to the rehabilitation of portions of the San Carlos Irrigation Project, a Bureau of Indian Affairs water delivery system that serves both the Gila River Indian Community and SCIDD. The project area extends along the current and realigned...
Cultural Resources Investigations along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Florence, Arizona: Report (2022)
In accordance with the provisions of the 2004 Arizona Water Settlement Act, the Bureau of Reclamation, Phoenix Area Office (PXAO) assisted the San Carlos Irrigation and Drainage District (SCIDD) in the preparation of an environmental assessment (EA) prior to the rehabilitation of portions of the San Carlos Irrigation Project, a Bureau of Indian Affairs water delivery system that serves both the Gila River Indian Community and SCIDD. The project area extends along the current and realigned...
Cultural Resources Investigations along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Florence, Arizona: Site Boundary Shapefiles (2022)
In accordance with the provisions of the 2004 Arizona Water Settlement Act, the Bureau of Reclamation, Phoenix Area Office (PXAO) assisted the San Carlos Irrigation and Drainage District (SCIDD) in the preparation of an environmental assessment (EA) prior to the rehabilitation of portions of the San Carlos Irrigation Project, a Bureau of Indian Affairs water delivery system that serves both the Gila River Indian Community and SCIDD. The project area extends along the current and realigned...
Cultural Resources Report-Anaconda Aqueduct Prospect Project (1981)
This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded. If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.
Cultural Resources Resurvey, Relocation, Assessment, and Evaluation of 117 Archaeological Sites for the Fannin-McFarland and Tucson Aqueducts, Central Arizona Project Canal, Maricopa, Pinal, and Pima Counties, Arizona (2017)
In compliance with Section 106 of the NHPA, the Bureau of Reclamation (Reclamation), Phoenix Area Office (PXAO) began cultural resource surveys along the Central Arizona Project (CAP) main stem alignment shortly after the CAP was authorized. For the next 25 years, various cultural resource management contractors conducted inventories of the CAP, recording several hundred archaeological sites. From the 1970s to the 1980s, some of these sites were tested and/or excavated as mitigation for the...
Cultural Resources Resurvey, Relocation, Assessment, and Evaluation of 16 Archaeological Sites for the Hayden Rhodes Aqueduct Phase IV Small Sites Assessment, Central Arizona Project Canal, Maricopa and La Paz Counties, Arizona (2018)
The Phoenix Area Office (PXAO), Reclamation, maintains an archaeological site database for the Central Arizona Project (CAP) main stem canal. The data base was developed using all the previous main stem survey data and previously recorded sites. While many sites have been determined eligible or not eligible for the National Register of Historic Places (Register), some have not received eligibility determinations and some are located outside of the construction corridor and not impacted....
A Cultural Resources Survey Along State Route 87 Between Center Street and North Mesa Drive on Lands of the Salt River Pima-Maricopa Indian Community, Maricopa County, Arizona (1988)
In late August, 1988, Archaeological Research Services, Inc. performed a cultural resources survey of an approximately 4700 ft long by 67 ft wide (7.23 acres) corridor of highway easement along the northwest side of State Route 87 (between Center Street and Mesa Drive) for the Arizona Department of Transportation. This study area is located north of Mesa, Maricopa County, Arizona on lands of the Salt River Pima-Maricopa Indian Community. Six prehistoric archaeological sites were observed and...