Cultural Resources Investigations along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Florence, Arizona: Site Boundary Shapefiles

Summary

In accordance with the provisions of the 2004 Arizona Water Settlement Act, the Bureau of Reclamation, Phoenix Area Office (PXAO) assisted the San Carlos Irrigation and Drainage District (SCIDD) in the preparation of an environmental assessment (EA) prior to the rehabilitation of portions of the San Carlos Irrigation Project, a Bureau of Indian Affairs water delivery system that serves both the Gila River Indian Community and SCIDD. The project area extends along the current and realigned portions of the Florence Canal, from the sediment basin just south of the Ashurst-Hayden Diversion Dam to Picacho Reservoir.

In order to comply with stipulations set forth in the EA, all historic properties within the expanded APE must be mitigated prior to construction. At the request of PXAO, Archaeological Consulting Services, Ltd. prepared a historic property treatment plan (treatment plan) to conduct Phase 2 data recovery at AZ U:15:676(ASM), eligibility testing at AZ U:15:861(ASM), Phase 1 data recovery for the new and previously uninvestigated portions of the canal alignment at AZ U:15:124(ASM) and AZ U:15:663(ASM), and Phase 2 data recovery based on previous excavations within the revised APE at AZ U:15:663(ASM). These shapefiles are the boundaries of cultural resources investigated during this project.

Cite this Record

Cultural Resources Investigations along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Florence, Arizona: Site Boundary Shapefiles. Matthew Gill, Brad Dilli. Tempe, Arizona: Archaeological Consulting Services, Ltd. ( tDAR id: 470258) ; doi:10.48512/XCV8470258

This Resource is Part of the Following Collections

Spatial Reference System & Projection: NAD83, Zone 12

Currentness & Update Notes: The maps are derived from the Cultural Resources Investigations along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Florence, Arizona work conducted by ACS in 2018, 2019, and 2021.


Temporal Coverage

Calendar Date: 1125 to 1300 (Classic Period (Soho Phase))

Calendar Date: 850 to 1300 (Late Colonial thru Early Classic Periods)

Calendar Date: 650 to 1300 (Middle Pioneer thru Early Classic Periods)

Spatial Coverage

min long: -111.563; min lat: 32.836 ; max long: -111.285; max lat: 33.114 ;

Record Identifiers

Archaeological Consulting Services, Ltd. Project No.(s): 18-015 / AZ-0106

Reclamation Order No.(s): R17PA00025, Calls 140R3018F0029 and 140R3019F0007

Arizona Antiquities Act (AAA) project-specific permit no.(s): 2018-088ps

ARPA Permit No.(s): 2018/SCIP/ACS/WRO/001a

Arizona State Land Department Right-of-Way Application No. (s): 72-102883

Notes

General Note: N/A

File Information

  Name Size Creation Date Date Uploaded Access
18_015_Site_Boundaries.prj 567.00b Aug 22, 2022 Aug 23, 2022 11:23:51 AM Confidential
18_015_Site_Boundaries.sbx 124.00b Aug 22, 2022 Aug 23, 2022 11:23:51 AM Confidential
18_015_Site_Boundaries.shp 2.41kb Aug 22, 2022 Aug 23, 2022 11:23:51 AM Confidential
18_015_Site_Boundaries.shp.xml 12.84kb Aug 22, 2022 Aug 23, 2022 11:23:51 AM Confidential
18_015_Site_Boundaries.shx 132.00b Aug 22, 2022 Aug 23, 2022 11:23:51 AM Confidential
18_015_Site_Boundaries.dbf 150.00b Aug 22, 2022 Aug 23, 2022 11:23:51 AM Confidential
18_015_Site_Boundaries.sbn 180.00b Aug 22, 2022 Aug 23, 2022 11:23:51 AM Confidential

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): USDI Bureau of Reclamation, Phoenix Area Office