Artifact Scatter (Site Type Keyword)

Parent: Archaeological Feature

Prehistoric lithic and/or ceramic scatters with no features.

451-475 (6,356 Records)

Archaeological Data Recovery at Site 9GE2178 Greene County, Georgia (2008)
DOCUMENT Full-Text Jannie Loubser. Thomas G. Whitley.

9GE2178 (UTMZone 17, E292662, N3704897) is a Lamar period Mississippian artifact scatter on a ridge top edge, ranging in height between 462 and 472 feet above mean sea level (141-144 m amsl). Located barely 100 meters west of Lake Oconee’s high water shore line (formerly Richland Creek), the approximately 4,048-square-meter (93 m E/W x 55 m N/S) site is covered by a moderately dense growth of pines and a few young hardwoods with variable ground cover. Much of the slope directly to the south,...


Archaeological Data Recovery at the Armstrong-Rogers Site (7NC-F-135) Appendices (2017)
DOCUMENT Full-Text D. Brad Hatch. Kerry S. Gonzalez. Kerri S. Barile. Nicole Doub. Justine McKnight. Elizabeth Moore. Andrew Wilkins. Michael Worthington.

On behalf of the Delaware Department of Transportation (DelDOT), Dovetail Cultural Resource Group (Dovetail) conducted a Phase III archaeological data recovery at the Armstrong-Rogers site (7NC-F-135), a late-eighteenth- through mid-nineteenth-century farmstead work yard in New Castle County, Delaware. The work was completed in association with DelDOT’s U.S. Route 301 Project and the site is located within the project’s Area of Potential Effects (APE) in the U.S. Route 301 mainline corridor just...


Archaeological Data Recovery at the Armstrong-Rogers Site(7NC-F-135) New Castle County, Delaware (2017)
DOCUMENT Full-Text D. Brad Hatch. Danae Peckler. Joseph Blondino. Kerry S. Gonzalez. Emily Calhoun. Kerri S. Barile.

On behalf of the Delaware Department of Transportation (DelDOT), Dovetail Cultural Resource Group (Dovetail) conducted a Phase III archaeological data recovery at the Armstrong-Rogers site (7NC-F-135), a late-eighteenth- through mid-nineteenth-century farmstead work yard in New Castle County, Delaware. The work was completed in association with DelDOT’s U.S. Route 301 Project and the site is located within the project’s Area of Potential Effects (APE) in the U.S. Route 301 mainline corridor just...


Archaeological Data Recovery at the Leake Site, Bartow County, Georgia (vol. 1) (2010)
DOCUMENT Full-Text Scot Keith.

Southern Research, Historic Preservation Consultants, Inc. conducted two archaeological data recovery excavations at the Leake site between 2004 and 2006. The first excavation, from November 2004 through September 2005, was carried out for the Georgia Department of Transportation (GDOT) to mitigate the adverse impacts to the site from the proposed widening of State Routes 61 and 113. A second smaller data recovery, carried out in December of 2006, was done for the Bartow County Water Department...


Archaeological Data Recovery at the Leake Site, Bartow County, Georgia (vol. 2 - Appendices) (2010)
DOCUMENT Full-Text Scot Keith.

Appendices for Leake site data recovery report


Archaeological Data Recovery at the Rohrig Substation, Queen Creek, Arizona (2006)
DOCUMENT Full-Text T. Kathleen Henderson.

The Southwest Germann site is among the largest of prehistoric Hohokam settlements in the Queen Creek area. The Rohrig Substation property is located at its southwestern edge and overlaps a previously unreported habitation locus. Archaeological testing (Phase 1 data recovery) at the substation documented the presence of adobe-walled rooms, puddling pits, and trash deposits that were probably contained within an adobe-walled compound on the easternmost side of the Rohrig property. Salt River...


Archaeological Data Recovery at the Sunset Mesa Ruin (AZ AA:12:10 ASM) (1998)
DOCUMENT Full-Text Deborah L. Swartz. Jenny L. Adams.

Phase 1 Data Recovery was conducted at the Sunset Mesa Ruin, AZ AA:12:10 (ASM), to evaluate the archaeological resources that will be impacted by the gravel mining operations of Tucson Ready Mix, Inc. The information gathered from the excavated backhoe trenches, added to previous archaeological investigations at the site, has identified several loci where prehistoric and historic or modern features cluster. Two areas were also identified that may be cremation cemeteries. The historic features...


Archaeological Data Recovery at the Tortolita Vistas Site, AZ AA:12:271 (ASM): A Hohokam Fieldhouse in Marana, Pima County, Arizona (2005)
DOCUMENT Full-Text Deborah Swartz.

Archaeological data recovery was conducted at the Tortolita Vistas site, AZ AA:12:271 (ASM), prior to construction of a housing development in Marana by Cottonwood Properties. This fieldhouse site is situated on the upper bajada of the Tortolita Mountains. A single pit structure and five extramural features were discovered and completely excavated: 2 roasting pits, 2 small extramural pits, and 1 trash concentration. No human remains were found. Ceramic analysis dates the site occupation to...


Archaeological Data Recovery Excavations at the Sanders Great House and Six Other Sites Along US Highway 191, South of Sanders, Apache County, Arizona, Volume 1 (1994)
DOCUMENT Full-Text Thomas F. Fletcher.

This report presents the results of data recovery investigations at the Sanders Great House site and six other sites within the right-of-way of US Highway 191, south of Sanders, Apache County, Arizona. The project was sponsored by the Arizona Department of Transportation (ADOT). All excavation work was conducted on ADOT land, with the exception of a small portion of the right-of-way crossing site AZ K:15:17 that is part of the Navajo Nation Chambers-Sanders Trust Lands (CSTL). Data recovery...


Archaeological Data Recovery Excavations at the Sanders Great House and Six Other Sites Along US Highway 191, South of Sanders, Apache County, Arizona, Volume 2 (1994)
DOCUMENT Full-Text Thomas F. Fletcher.

This report presents the results of data recovery investigations at the Sanders Great House site and six other sites within the right-of-way of US Highway 191, south of Sanders, Apache County, Arizona. The project was sponsored by the Arizona Department of Transportation (ADOT). All excavation work was conducted on ADOT land, with the exception of a small portion of the right-of-way crossing site AZ K:15:17 that is part of the Navajo Nation Chambers-Sanders Trust Lands (CSTL). Data recovery...


Archaeological Data Recovery for the Ellsworth Road Widening Project, Queen Creek, Maricopa County, Arizona (2010)
DOCUMENT Full-Text A.E. (Gene) Rogge. Pamela J. Cox.

MCDOT and the Town of Queen Creek are widening 2.7 kilometers (1.7 miles) of Ellsworth Road to six lanes. MCDOT retained URS Corporation to conduct cultural resource studies to address the Maricopa County Comprehensive Plan objectives for promoting appreciation and preservation of significant archaeological and historical resources within the framework of state and federal laws. The law applicable to this project is the Arizona Antiquities Act. A survey documented that the project could affect...


Archaeological Data Recovery for the Santan Mountains Land Exchange (1989)
DOCUMENT Full-Text Kim Adams. Ann Valdo Howard. Barbara S. Macnider.

In December 1988, Archaeological Consulting Services, Ltd. (ACS) conducted an archaeological survey in and around the eastern portion of the Santan Mountains in preparation for a land exchange between Julian Berry and the Bureau of Land Management (BLM), Phoenix District Office (Adams et al . 1989). As a result, 13 sites, 112 artifact scatters, and 284 isolated finds were recorded. Testing and data recovery measures were recommended for six of the sites.The sites are located within the Basin and...


Archaeological Data Recovery for Tonto Natural Bridge State Park Design of Access Roads: Preliminary Summary of Findings (1994)
DOCUMENT Full-Text J. Simon Bruder.

The Arizona Department of Transportation (ADOT) is planning to undertake construction associated with the design of access roads and parking areas for the Tonto Natural Bridge State Park. Areas where ground disturbance will occur include (1) existing and new roads and parking areas within the park; (2) the access road across the Tonto National Forest, which will be upgraded, and (3) an area south of the Forest access road where a stock tank will be installed. Five archaeological sites that...


Archaeological Data Recovery in the Proposed Haig Mill Creek Reservoir, Whitfield County, Georgia (1993)
DOCUMENT Citation Only Daniel T. Elliott. Geraldine E. Baldwin. Jeffrey L. Holland.

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded. If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.


Archaeological Data Recovery Investigations at Edwards Plantation (38BU1), Lot 9, Old Boathouse Lane, Spring Island, Beaufort County, South Carolina (2016)
DOCUMENT Full-Text Larry James. Ralph Bailey. Colin Brooker. Charlie Philips.

Stonemark Construction Management contracted Brockington and Associates, Inc. on behalf of the owners, Susan and Ronald Morrow, to conduct data recovery investigations at Lot 9, Old Boathouse Lane, on Spring Island, located near Beaufort, South Carolina. Lot 9 partially encloses the northern portions of archaeological site 38BU1. Site 38BU1 has been identified as the site of the eighteenth- through nineteenth-century Edwards Plantation complex. Site 38BU1 was first recorded by R.L. Stephenson in...


Archaeological Data Recovery of 1.1 Acres within the Prehistoric Site of La Ciudad (AZ T:12:1[ASM]), Phoenix, Maricopa County, Arizona (2010)
DOCUMENT Full-Text John T. Marshall. Douglas B. Craig.

This document presents a report describing archaeological data recovery within a 1.1 acre parcel located near the eastern edge of AZ T:12:1(ASM), a large Hohokam village known as La Ciudad. Data recovery was undertaken to collect information and analyze materials from a sample of features at the site in order to mitigate the impacts of the planned construction of a women’s center for victims of domestic abuse. A single prehistoric pit house was investigated during the project. No additional...


Archaeological Data Recovery of AZ N:4:110(ASM) at Grey Fox Ridge, Cottonwood, Yavapai County, Arizona (2011)
DOCUMENT Full-Text Uploaded by: Stewart Deats

This document presents the results of archaeological data recovery investigations at Site AZ N:4:110(ASM) within the private development known as Grey Fox Ridge. EnviroSystems Management, Inc. conducted the work at the request of the property owner who needed to mitigate the adverse effects to the site resulting from land development. The site is approximately one-half mile northwest of downtown old Cottonwood and one-quarter mile southwest of the Verde River in Yavapai County, Arizona. The...


Archaeological Data Recovery Plan for the Ellsworth Road (Hunt Highway to Cloud Road) Widening Project, Queen Creek, Maricopa County, Arizona (2008)
DOCUMENT Full-Text Pamela J. Cox. A.E. (Gene) Rogge.

The Maricopa County Department of Transportation (MCDOT) is planning to widen about 2.3 kilometers (1.4 miles) of Ellsworth Road to six lanes from near the Hunt Highway (just north of Empire Boulevard) north to Cloud Road. The project will involve construction of a new aggregate base and asphaltic concrete; bike lanes; a raised median; curb, gutter, and scupper structures; sidewalks; and lighting arrays. MCDOT retained URS Corporation to conduct a cultural resource study to provide assistance in...


An Archaeological Data Recovery Program at CA-Sbr-1913, on the Mojave Siphon Project, Summit Valley, San Bernardino County, California (1991)
DOCUMENT Citation Only Mark Q. Sutton. Joan S. Schneider.

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded. If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.


Archaeological Eligibility Testing at NA31,287 at the Navajo Generating Station, Coconino County, Arizona (2018)
DOCUMENT Full-Text John T. Marshall.

In 2019, the Salt River Project (SRP) plans to decommission the Navajo Generating Station (NGS) and associated Ash Disposal Area (ADA), located east of Page, Coconino County, Arizona (Figure 1). Prior to the decommissioning, SRP sponsored cultural resources surveys (Marshall 2018a; Spurr 2017) to record archaeological sites within the NGS and ADA. These efforts supplement previous archaeological investigations (Mueller and Fiero 1971; Pilles 1969). As a result of the recent surveys, Spurr (2017)...


An Archaeological Evaluation of a Fuel Tank Construction Project Site near Bartlett Dam, Maricopa County, Arizona (1985)
DOCUMENT Full-Text Lyle M. Stone.

On March 21, 1985, Lyle M. Stone of Archaeological Research Services, Inc. (ARS) performed an archaeological survey at the proposed location for the construction of a 300 gallon fuel tank on U.S. Forest Service (Tonto National Forest, Cave Creek Ranger District) land near Bartlett Dam, Maricopa County, Arizona. The fuel tank will be constructed by Salt River Project (SRP) and will supply fuel to an adjacent 80 kwh diesel generator which will be constructed inside the north end of the "bunkhouse"...


An Archaeological Evaluation of a Proposed Electric Power Line Construction Project on Tonto Creek near El Oso Road and Highway 188, Gila County, Arizona (1983)
DOCUMENT Full-Text Lyle M. Stone.

On December 12, 1983, Lyle M. Stone and Douglas R. Mitchell of Archaeological Research Services, Inc. performed an archaeological survey along the route of a proposed power line construction project on Tonto Creek near the intersection of El Oso Road and Highway 188, Gila County, Arizona. This project, proposed by Salt River Project, will entail: (1) the construction of 755 ft of new underground electric line; (2) the construction of 1200 ft of new overhead line; and (3) the modification of...


An Archaeological Evaluation of a Small Parcel of Land Near Granite Reef Dam, Maricopa County, Arizona (1982)
DOCUMENT Full-Text Lyle M. Stone.

On August 27, 1982, Lyle M. Stone and James E. Ayres of Archaeological Research Services, Inc. (ARS) performed an archaeological survey of an approximately 128 acre parcel of land on the south side of the Salt River near Granite Reef Dam. The study area consists of U. S. Department of the Interior, Bureau of Land Management-administered land which has been withdrawn for U. S. Bureau of Reclamation purposes for use by the Salt River Project. Accordingly, this survey was performed under the...


Archaeological Evaluation Of The Aerial Cable Site At Sandia National Laboratories, Bernalillo County, New Mexico: Special Technical Report 2 (1992)
DOCUMENT Full-Text Steven R. Hoagland.

An archaeological survey was conducted by archaeologists with Chambers Group Inc. (CGI) on approximately 579 ha (1,447 acres) of property situated within Kirtland Air Force Base (KAFB), Bernalillo County, New Mexico. This survey was conducted on the Burn Site, Aerial Cable Site (ACS), and portions of the surrounding area for Sandia National Laboratories (SNL). This inventory yielded 1 previously recorded and 40 newly discovered cultural resource sites and 80 isolated occurrences (IOs). One...


Archaeological Evaluation of Three Sites for the Goldfield-Silver King 230 kV Transmission Line, Near Superior, Arizona (2000)
DOCUMENT Full-Text Douglas R. Mitchell. Ron F. Ryden.

Salt River Project (SRP) is planning to install fiber optic communication on the Goldfield to Silver King 230 kV transmission line system on the Mesa and Globe Ranger districts in Pinal County, Arizona. The project will entail replacing a static line with a combination static-fiber optic line. This will require a wire trailer/puller and crane to be positioned near certain towers for wire pulling. Both pieces of equipment are rubber-tired to minimize ground disturbance. SWCA was contracted to...