Target Range (Site Type Keyword)

1-7 (7 Records)

Archaeological Site Relocation, Testing, and National Register of Historic Places Evaluation of Selected Prehistoric and Historic Archaeological Sites Volume I: Final Phase II Report, Addendum Volume II: Appendix A - Updated Site Forms (2001)
DOCUMENT Full-Text James M. Brechtel.

The Environmental Management Office at Warren Air Force Base requested archaeological site relocation, testing (if necessary), and site form revisions for selected historic and prehistoric archaeological sites on the base west of Cheyenne, Wyoming. Warren Air Force Base requested the work as part of its comprehensive plan to locate, evaluate, and nominate cultural resources for listing on the National Register of Historic Places (NRHP), to comply with Section 110 (a) 2 of the National Historic...


Cultural Resources Investigations for Explosive Ordnance Disposal at F.E. Warren AFB, Wyoming: Volume I (1988)
DOCUMENT Full-Text Tetra Tech, Inc..

From May 4 through July 11, 1987, cultural resource investigations were conducted by Tetra Tech, Inc. personnel at F.E. Warren Air Force Base (AFB), Wyoming. The study included intensive and reconnaissance surveys, site testing, monitoring, and reevaluation of National Register of Historic Places (NRHP) eligible sites. Seventeen prehistoric sites, 17 historic sites, 80 isolated finds (IFs), and 27 modern features were recorded in the project area. The project area consisted of 2,235 acres in the...


F.E. Warren AFB Project Metadata
PROJECT Uploaded by: Rachel Fernandez

Metadata for the F.E. Warren AFB collection.


Mitigation Plan for Cultural Resources Affected by Peacekeeper Rail Garrison Construction, F.E. Warren Air Force Base, Cheyenne, Wyoming (1990)
DOCUMENT Full-Text Susan L. Bupp. Fredrick S. Hickman. Raj Mathur. John R. Sabol.

In 1986, President Reagan announced his decision to begin development of the Rail Garrison basing mode for the deployment of Peacekeeper missiles. In this basing mode, Peacekeeper missiles would be deployed on trains garrisoned at specified Air Force installations. F.E. Warren Air Force Base (AFB) near Cheyenne, Wyoming, was designated by the President as the Main Operating Base and the first garrison installation. Construction of Peacekeeper Rail Garrison facilities at F. E. Warren AFB is...


Mitigation Plan for FEW 220: An Element of 48-LA-71Y, The Fort D.A. Russell Early Target Ranges, F.E. Warren Air Force Base, Wyoming (1985)
DOCUMENT Full-Text Tetra Tech, Inc..

FEW 220 is one of five target houses at the end of a pre-1890s rifle target practice range associated with Fort D.A. Russell. These early Fort D.A. Russell target ranges are historically important sites. No historic evidence of their existence has yet been located. Further, they represent a very early style of formal U.S. Army firearms training ranges for which little historical and no archeological documentation has been provided within scholarly publications or reports. The resource will be...


Peacekeeper Program Component Effect Report #8 Heating Distribution Lines (1984)
DOCUMENT Full-Text Norton Air Force Base. Kevin J. Peter. Jay R. Cohen.

A cultural resources survey associated with the proposed Heating Distribution Lines (HDL) Component of the Peacekeeper Program at F.E. Warren Air Force Base (AFB), Wyoming, resulted in the discovery of ten previously unknown archeological sites; four of these sites occur in direct impact areas. The Air Force, in consultation with the Wyoming State Historic Preservation Officer (SHPO), has determined that two of the properties in direct impact areas (48-LA-71X and 48-LA-482) are eligible for...


Peacekeeper Program: Preliminary Component Effect Report, Energy Management and Control System, F.E. Warren Air Force Base, Wyoming (1985)
DOCUMENT Full-Text Tetra Tech Inc..

As outlined in the Peacekeeper Program Cultural Resources Management Plan (U.S. Air Force 1984), the Air Force is preparing a series of Component Effect Reports (CERs) covering proposed actions required for system deployment. This document is an abbreviated report reviewing the Energy Management and Control System (EMCS) prior to the 30% design review. A complete CER will be produced after 30% design review when final plans are available. The EMCS component consists of installing fiber optic...