Sacaton Phase (Temporal Keyword)

76-100 (164 Records)

Excavations at La Villa: Continuity and Change at an Agricultural Village (2015)
DOCUMENT Full-Text Uploaded by: system user

The archaeological excavations documented in this volume examine the Hohokam village of La Villa, AZ T:12:148 (ASM). From its founding in the sixth century A.D., until abandonment in the eleventh century, La Villa was one of the largest villages in the Phoenix Basin. Current excavations preceded the installation of a storm drain that was part of the larger Storm Drain project and provided a rare glimpse of a large pre-Classic period village. Fieldwork occurred in multiple phases. Archaeological...


Excavations at the Mound 3 Precinct Southeast Cemetery, Las Colinas, AZ T:12:10(ASM) (2008)
DOCUMENT Full-Text K.J. Schroeder.

Advanced Mobile Storage, Inc . (AMS) Phoenix. Arizona, undertook upgrades and modifications to its existing storage facility in the Fall of 2007, during which time all ground disturbing activities were monitored by Roadrunner Archaeology & Consulting (RAC) staff. The storage facility is an irregular L-shaped area within a 385 x 460 ft area consisting of approximately 3.074 acres of privately owned property. In addition, an area approximately 20 x 17 5 meters of Phoenix City property was...


Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Ceramic Data (2012)
DATASET Archaeological Consulting Services, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Flotation Data (2012)
DATASET Archaeological Consulting Services, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Lithic Data (2012)
DATASET Archaeological Consulting Services, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Photolog (2012)
DOCUMENT Full-Text Archaeological Consulting Services, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Photos (2012)
IMAGE Archaeological Consulting Services, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Pollen Data (2012)
DATASET Archaeological Consulting Services, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report for Phased Data Recovery at AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Redacted Pages (2012)
DOCUMENT Full-Text Uploaded by: ACS Tempe

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Redacted Report (2012)
DOCUMENT Full-Text Uploaded by: ACS Tempe

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Shell Data (2012)
DATASET Archaeological Consulting Sevices, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report for Plan 6 Supplemental Cultural Resource Surveys (1985)
DOCUMENT Full-Text Margerie Green. R. W. Effland, Jr.. J. H. King.

This final report reflects a year of on-call Class III cultural resource surveys for Plan 6, the Regulatory Storage Division of the Central Arizona Project. Included are eight reports representing close to 6000 acres of survey performed in the vicinity of the planned New Waddell Dam by Archaeological Consulting Services for the Arizona Projects Office, U.S. Bureau of Reclamation. Because New Waddell Dam is designed to be rock filled, one of the focal points of the contract was to survey proposed...


Gisela Pueblo 580 Arizona Site Steward File (2001)
DOCUMENT Full-Text Monroe Amsden. Germick .

This is an Arizona Site Steward File for the Gisela Pueblo 580 site, located on Tonto National Forest land. The site is comprised of a pueblo compound, trash midden, roasting pits, checkdams, terraces, and a possible partial wall. The file consists of a heritage inventory form, five hand drawn site maps, an unlabeled data form, and two maps of the site location. The earliest dated document is from 1929.


Goldfield Arizona Site Steward File (1984)
DOCUMENT Full-Text Connie Stone. Cheryl Taylor.

This is an Arizona Site Steward file for the Goldfield site which is located on Bureau of Land Management and privately owned land. The site consists of mounds and rock features, likely indicative of a Hohokam habitation site, as well as a plaza and artifact scatter. The file consists of a site information sheet, map of the site location, and cultural resource site record form. The earliest document is dated 1984.


The Grewe Archaeological Research Project, Volume 2: Material Culture, Part I: Ceramic Studies (2001)
DOCUMENT Full-Text Uploaded by: Rachel Fernandez

This is the second in a series of three volumes documenting the results of the Grewe Archaeological Research Project (GARP). The Project was carried out by Northland Research, Inc. (Northland), under contract to the Arizona Department of Transportation (ADOT). Portions of three prehistoric sites were investigated on the project - Grewe, Horvath, and Casa Grande Ruins. Each of the sites represents a separate spatial and temporal component of the Grewe-Casa Grande settlement, one of the preeminent...


The Grewe Archaeological Research Project, Volume 2: Material Culture, Part II: Stone, Shell, and Bone Artifacts and Biological Remains (2001)
DOCUMENT Full-Text Uploaded by: Rachel Fernandez

This is the second in a series of three volumes documenting the results of the Grewe Archaeological Research Project (GARP). The Project was carried out by Northland Research, Inc. (Northland), under contract to the Arizona Department of Transportation (ADOT). Portions of three prehistoric sites were investigated on the project - Grewe, Horvath, and Casa Grande Ruins. Each of the sites represents a separate spatial and temporal component of the Grewe-Casa Grande settlement, one of the preeminent...


The Grewe Archaeological Research Project, Volume 3: Synthesis (2001)
DOCUMENT Full-Text Uploaded by: Rachel Fernandez

This is the third and final volume documenting the results of the Grewe Archaeological Research Project (GARP). The Project was carried out by Northland Research, Inc. (Northland), under contract to the Arizona Department of Transportation (ADOT). Portions of three prehistoric sites were investigated on the project - Grewe, Horvath, and Casa Grande Ruins. Each of the sites represents a separate spatial and temporal component of the Grewe-Casa Grande settlement, one of the preeminent Hohokam...


Hayden Rhodes Aqueduct Phase IV Small Sites Assessment, Central Arizona Project Canal
PROJECT Bureau of Reclamation.

The Phoenix Area Office (PXAO), Reclamation, maintains an archaeological site database for the Central Arizona Project (CAP) main stem canal. The data base was developed using all the previous main stem survey data and previously recorded sites. While many sites have been determined eligible or not eligible for the National Register of Historic Places (Register), some have not received eligibility determinations and some are located outside of the construction corridor and not impacted....


Hayden Rhodes Aqueduct Phase IV Small Sites Assessment, Central Arizona Project Canal: Photo Logs (2018)
DOCUMENT Full-Text Archaeological Consulting Services, Ltd.. Walter R. Punzmann. Douglas Mitchell. Jennifer Rich.

The Phoenix Area Office (PXAO), Reclamation, maintains an archaeological site database for the Central Arizona Project (CAP) main stem canal. The data base was developed using all the previous main stem survey data and previously recorded sites. While many sites have been determined eligible or not eligible for the National Register of Historic Places (Register), some have not received eligibility determinations and some are located outside of the construction corridor and not impacted....


Hayden Rhodes Aqueduct Phase IV Small Sites Assessment, Central Arizona Project Canal: Photos (2018)
IMAGE Archaeological Consulting Services, Ltd.. Walter R. Punzmann.

The Phoenix Area Office (PXAO), Reclamation, maintains an archaeological site database for the Central Arizona Project (CAP) main stem canal. The data base was developed using all the previous main stem survey data and previously recorded sites. While many sites have been determined eligible or not eligible for the National Register of Historic Places (Register), some have not received eligibility determinations and some are located outside of the construction corridor and not impacted....


Hayden Rhodes Aqueduct Phase IV Small Sites Assessment, Central Arizona Project Canal: Project Location Shapefiles (2018)
GEOSPATIAL Archaeological Consulting Services, Ltd.. Brad Dilli. Zachary Rothwell. Matthew Gill.

The Phoenix Area Office (PXAO), Reclamation, maintains an archaeological site database for the Central Arizona Project (CAP) main stem canal. The data base was developed using all the previous main stem survey data and previously recorded sites. While many sites have been determined eligible or not eligible for the National Register of Historic Places (Register), some have not received eligibility determinations and some are located outside of the construction corridor and not impacted....


Hayden Rhodes Aqueduct Phase IV Small Sites Assessment, Central Arizona Project Canal: Sites Location Shapefiles (2018)
GEOSPATIAL Archaeological Consulting Services, Ltd.. Brad Dilli. Zachary Rothwell. Matthew Gill.

The Phoenix Area Office (PXAO), Reclamation, maintains an archaeological site database for the Central Arizona Project (CAP) main stem canal. The data base was developed using all the previous main stem survey data and previously recorded sites. While many sites have been determined eligible or not eligible for the National Register of Historic Places (Register), some have not received eligibility determinations and some are located outside of the construction corridor and not impacted....


Hohokam Archaeology along the Salt-Gila Aqueduct Central Arizona Project, Volume I: Research Design (1982)
DOCUMENT Full-Text Uploaded by: system user

This volume is the first in a series of publications associated with the Salt-Gila Aqueduct Archaeological Data Collection Studies and Supplemental Class 3 Survey Project (SGA). The project focuses principally upon data recovery at those sites potentially subject to impact as a consequence of Central Arizona Project construction along a route extending 97 km from a point south of Apache Junction, Arizona, to the Picacho Reservoir. This initial volume incorporates the results of test excavations...


Hohokam Archaeology along the Salt-Gila Aqueduct Central Arizona Project, Volume II: Supplemental Archaeological Survey (1982)
DOCUMENT Full-Text Uploaded by: system user

This is the second volume in the series of reports on archaeology conducted for the United States Bureau of Reclamation along the route of the Salt-Gila Aqueduct, a component of the Central Arizona Project designed to transport water a distance of 58 miles from east of Phoenix to the vicinity of the Picacho Mountains in Arizona. The project is largely concerned with data recovery at sites identified during previous surveys of the aqueduct alignment. However, as actual construction of the...


Hohokam Archaeology along the Salt-Gila Aqueduct Central Arizona Project, Volume III: Specialized Activity Sites (1983)
DOCUMENT Full-Text Uploaded by: system user

This volume is the third in a nine volume series reporting the results of archaeological investigations conducted along the right-of-way of the Salt-Gila Aqueduct. The aqueduct, under construction by the U.S. Bureau of Reclamation (USBR), is part of the Central Arizona Project. The emphasis of this volume is directed toward specialized activity sites, most of which relate to wild plant or lithic processing or agriculture. All are located along Reaches 1 through 4 of the aqueduct, from just south...