Phase 2: Reaches 1, 2, and 3 Rehabilitation
Part of: San Carlos Irrigation and Drainage District (SCIDD) Rehabilitation Project
This collection encompasses archaeological survey, archival research, Phase 1 data recovery, and Phase 2 data recovery conducted prior to the relining and rehabilitation of Reaches 1, 2, and 3 of the San Carlos Irrigation and Drainage District Rehabilitation Project. Reaches 1, 2, and 3 comprise the second phase of the San Carlos Irrigation and Drainage District Rehabilitation Project, which was authorized under the Arizona Water Settlements Act of 2004. The Bureau of Reclamation is the lead federal agency for the environmental and cultural compliance process. The project proponent is the San Carlos Irrigation and Drainage District. Cooperating agencies and entities include the Bureau of Indian Affairs, the San Carlos Irrigation Project, and the Pima-Maricopa Irrigation Project.
Site Name Keywords
Florence-Casa Grande Canal •
AZ AA:3:215(ASM) •
AZ U:15:47(ASM) •
Florence Canal •
AZ U:15:663(ASM) •
AZ U:15:124(ASM) •
AZ U:15:667(ASM) •
AZ AA:2:130(ASM) •
AZ FF:9:17(ASM) •
Diversion Dam Road
Site Type Keywords
Resource Extraction / Production / Transportation Structure or Features •
Agricultural or Herding •
Canal or Canal Feature •
Road, Trail, and Related Structures or Features •
Road •
Archaeological Feature •
Artifact Scatter •
Reservoir •
Water Control Feature •
Bridge
Culture Keywords
Hohokam •
Historic •
Euroamerican •
Archaic
Investigation Types
Archaeological Overview •
Architectural Survey •
Reconnaissance / Survey •
Systematic Survey •
Historic Background Research
Material Types
Ceramic •
Chipped Stone •
Glass •
Metal •
Ground Stone •
Building Materials •
Wood
Temporal Keywords
Ceramic Period •
Historic Euro-American •
Late Historic period •
Hohokam
Geographic Keywords
Arizona (State / Territory) •
United States of America (Country) •
Pinal County (County) •
North America (Continent) •
Picacho Reservoir •
Pinal County, AZ •
USA (Country) •
Central Pinal County