Salt River Project
Institution Members
351-400 (977 Records)
Documents
- Class III Cultural Resources Survey for the Salt River Project 115kV Coolidge to Hayden Electrical Transmission Line Right-of-Way Easement Renewal in District 1 of the Gila River Indian Community, Pinal County, Arizona (2015)
- A Class III Cultural Resources Survey for the Union Pacific Railroad Company Pecos Industrial Rail Access and Train Extension (PIRATE) Project, Mesa and Queen Creek, Maricopa County, Arizona (2022)
- A Class III Cultural Resources Survey of 10.15 Acres for an SRP Pole Replacement and Distribution Lines, near Roosevelt Resort Park/Roosevelt Estates, Gila County, Arizona (2021)
- A Class III Cultural Resources Survey of 12.49 Acres for Two SRP Distribution Lines in the Mesa and Globe Ranger Districts, Tonto National Forest, Maricopa and Pinal Counties, Arizona (2020)
- A Class III Cultural Resources Survey of 133 Acres Along the Apache Trail, State Route 88, Between Mileposts 203.40 and 220.20, near Apache Junction, Tonto National Forest, Mesa Ranger District, Maricopa County, Arizona (2015)
- A Class III Cultural Resources Survey of 40.0 Acres in Support of the Eagle Mountain Trespass, Salt River-Pima Maricopa Indian Community, Maricopa County, Arizona (2022)
- A Class III Cultural Resources Survey of 8.364 Acres for the Proposed Huckleberry Mesa Transmission Line Project, Mesa, Maricopa County, Arizona (2021)
- A Class III Cultural Resources Survey of 9.3 Acres for SRP Distribution Lines in the Nammo Talley, Inc. Facility, Maricopa County, Arizona (2021)
- A Class III Cultural Resources Survey of an 8-Mile Long Transmission Right-of-Way for the Evergreen-McMullin 69kV Project, Salt River Pima-Maricopa Indian Community, Maricopa County, Arizona (2022)
- Class III Cultural Resources Survey of Approximately 4.3 Miles of the Horse Mesa Dam Road (FR 80), from the Apache Trail to Horse Mesa, Tonto National Forest, Mesa and Tonto Basin Ranger Districts, Maricopa County, Arizona (2020)
- A Class III Cultural Resources Survey of Approximately 64 Acres for a Proposed Salt River Project Well and Pipeline, St. Johns, Apache County, Arizona (2010)
- A Class III Cultural Resources Survey of Approximately 84 Acres of Existing Fenceline, Undeveloped Roads, and a Block Parcel within the Salado Preserve, South of St. Johns, Apache County, Arizona (2011)
- A Class III Cultural Resources Survey of the Salt River Project 230-kV and 500-kV Transmission Line Rights-of-Way from Silver King to the Western Forest Boundary, Tonto National Forest, Mesa and Globe Districts, and Private Lands near Superior, Pinal County, Arizona (2020)
- Class III Cultural Resources Survey Report: Carrel Interconnection Project, Pinal County, Arizona (2005)
- A Class III Resources Survey of 12.99 Acres for an SRP Pole Replacement and Distribution Lines near Roosevelt Lake Gardens, Gila County, Arizona (2021)
- A Class Ill Cultural Resources Inventory of 275 Miles of the Western Transmission System, from the Navajo Generating Station in Page, Coconino County, Arizona, to the McCullough Substation near Henderson, Clark County, Nevada - Volume 3: Nevada (2017)
- Completion of Archaeological Fieldwork at the La Plaza Hohokam Village Site, AZ U:9:165(ASM), for the Tempe Transportation Center (2007)
- Conceptualizing Landscapes in the San Pedro Valley of Arizona: American Indian Interpretations of Reeve Ruin and Davis Ruin (2003)
- Consolidated Canal, Chandler Power Plant - AZ-55-B - Written Historical and Descriptive Data, Photographs (2023)
- Consolidated Canal, Old South Consolidated Power Plant - AZ-55-A - South side of the Salt River, Approximately two miles downriver from Granite Reef Dam, Mesa vicinity, Maricopa County, Arizona - Written Historical and Descriptive Data, Photographs (2023)
- Consolidated Canal, South of the Salt River, Chandler Vicinity, Maricopa County, Arizona - AZ-55 - Written Historical and Descriptive Data, Photographs (2023)
- The Coronado Project Archaeological Investigations, The Coronado Generating Station Plant Site and Access Road (1980)
- The Coronado Project Archaeological Investigations, The Specialists' Volume: Biocultural Analyses (1982)
- The Coronado Project Archaeological Investigations: A Description of Ceramic Collections from the Railroad and Transmission Line Corridors (1982)
- The Coronado Project Archaeological Investigations: A Description of Lithic Collections from the Railroad and Transmission Line Corridors (1984)
- The Coronado Project Archaeological Investigations: Studies Along the Coal Haul Railroad Corridor (1986)
- The Coronado Project Archaeological Investigations: Studies Along the Transmission Line Corridor (1983)
- The Coronado Project Archaeological Investigations: The Ash Disposal and Evaporation Pond Site (1981)
- The Coronado Project Archaeological Investigations: The Concho Well Field Water Transmission Pipeline (1980)
- Coronado Project Transmission System: Southern Portion, Tonto National Forest: Stipulations and Plans and Site Prescriptions, Field Copy (1978)
- The Coronado Project: Anasazi Settlements Overlooking the Puerco Valley, Arizona, Volume 2 (1993)
- The Coronado Project: Anasazi Settlements Overlooking the Puerco Valley, Arizona, Volume 3 (1993)
- The Coronado Project: Anasazi Settlements Overlooking the Puerco Valley, Arizona, Volume I (1993)
- Craft Specialization in the Southern Tucson Basin: Archaeological Excavations at the Julian Wash Site, AZ BB:13:17 (ASM), Part 1: Introduction, Excavation Results, and Artifact Investigations (2011)
- Craft Specialization in the Southern Tucson Basin: Archaeological Excavations at the Julian Wash Site, AZ BB:13:17 (ASM), Part 2: Synthetic Studies (2011)
- Crismon Ruin: A Hohokam Settlement at the Head of the Lehi Canal System (2011)
- Cultural Assessment of Historic Properties in the Lehi Area, Mesa, Maricopa County, Arizona (1997)
- A Cultural Inventory of the Proposed Granite Reef and Salt-Gila Aqueducts, Agua Fria River to Gila River, Arizona (1969)
- A Cultural Inventory of the Salt River Indian Reservation, Arizona (1972)
- Cultural Overview and Sample Survey of 21,440 Acres for the Salt River Project (1981)
- A Cultural Overview and Sample Survey of 21,440 Acres for the Salt River Project (1981)
- Cultural Resource Analysis of the Changes to the Proposed Mead-Phoenix Transmission Project (1990)
- Cultural Resource Evaluation of Proposed Temporary Construction Use Area and Access Road (Site 3), for Kyrene to Silver King Link of Kyrene to Coronado 500kV Transmission Line (1977)
- A Cultural Resource Evaluation of the Salt River Project Fence Lake Coal Mine and Transportation Corridor in Catron County, New Mexico (1994)
- A Cultural Resource Inventory for the Southwest Loop Freeway Project: Phases One and Two of the Inventory and Planning Study for the Southwest Loop Project (1987)
- A Cultural Resource Inventory of a 14 Mile Long Powerline Right-of-Way in the Eldorado Valley, Clark County, Nevada (1991)
- A Cultural Resource Inventory of Approximately 1314 Acres for the Coronado Generating Station Land Addition, Apache County, Arizona (2002)
- A Cultural Resource Inventory of the Santan Expansion Project Natural Gas Pipe Line, Maricopa and Pinal Counties, Arizona (2002)
- Cultural Resource Survey Along 43rd Avenue Between Buckeye Road and Van Buren Street Phoenix, Maricopa County, Arizona (2000)
- A Cultural Resource Survey Along 75th and Southern Avenues, Maricopa County, Arizona (2000)