Clay (Material Keyword)

1-3 (3 Records)

Archaeological Investigations: Salt River Project, Coronado to Dinosaur Transmission Line, Private, State, and Federal Lands, Apache and Navajo Counties, Arizona: Final Report for Archaeological Survey of Proposed Transmission Line Right-Of-Way STA. 0+00 - STA. 3874+21 and Proposed Transmission Line Realignment Right-Of-Way STA. 1748+30 - STA. 2375+50 (1977)
DOCUMENT Full-Text Richard A. Brook.

Since May, 1975, the Museum of Northern Arizona, Department of Anthropology (hereafter "Museum"), has conducted archaeological investigations for the Salt River Project - Coronado Generating Station, Coronado-Dinosaur Transmission System, North End Project. This work, supported by contractual agreement, has consisted of an intensive archaeological survey of the proposed right-of-way, from Sta. 0+00 - Sta. 3874+21, and a realignment around Sta. 1748+30 to Sta. 2375+50, and the analysis and report...


Archaeomagnetic Dates and the Hohokam Phase Sequence (1988)
DOCUMENT Full-Text Jeffrey Eighmy. Randall H. McGuire.

Few things in Southwestern archaeology are so widely and hotly contested as the Hohokam phase sequence and chronology. Presently, no fewer than 12 different Hohokam chronologies exist and more appear to be under production. Disputes concerning the Hohokam chronology involve not only the dating of phases but also, even more basically, challenges to the integrity of the phase definitions. In the last decade, controversy has focused on three aspects of the chronology; (1) the validity and ordering...


Mitigation Plan for the Salt-Gila Aqueduct (1979)
DOCUMENT Full-Text Pat H. Stein.

In 1978, the Bureau of Reclamation (Reclamation) directed the Museum of Northern Arizona (MNA) to complete an intensive archaeological survey of the proposed alignment for the Salt-Gila Aqueduct, a feature of the Central Arizona Project. The survey area was 11,115 acres and included the 60 mile-long transmission line (with a typical width of 200 meters), three proposed utility line locations, one flood retention dike location, 11 possible spoil or realignment areas, and a subsidence well....