Component Effect Report (Other Keyword)
1-8 (8 Records)
Metadata for the F.E. Warren AFB collection.
Peacekeeper Program Component Effect Report #1 Weapons Storage Area (1984)
A cultural resources survey of the Weapons Storage Area (WSA) Component impact area resulted in the discovery of one previously unknown archeological site (48-LA-71C). The Air Force, in consultation with the Wyoming State Historic Preservation Officer (SHPO), has determined that this site is not eligible for inclusion in the National Register of Historic Places (NRHP). In addition, a contractor's access route will use an existing road that transects the site of the Cheyenne Depot (48-LA-106). No...
Peacekeeper Program Component Effect Report #2 Stage Storage Area (1984)
A cultural resources survey of the Stage Storage Area (SSA) Component impact area resulted in the discovery of seven previously unknown archeological sites, a diffuse scatter of historic artifacts associated with Fort D.A. Russell/F.E. Warren Air Force Base, and four isolated artifacts. The Air Force, in consultation with the Wyoming State Historic Preservation Officer (SHPO), has determined that one of these properties (48-LA-473) is eligible for inclusion in the National Register of Historic...
Peacekeeper Program Component Effect Report #4 Trainer and Instruction Facility (1984)
The proposed Trainer and Instruction Facility (TIF) Component of the Peacekeeper Program is a new building to be constructed within the F.E. Warren Historic District/National Landmark and within the historic boundaries of Cheyenne Depot, which has been determined to be eligible for listing in the National Register of Historic Places (NRHP). The Air Force, in consultation with the Wyoming State Historic Preservation Officer (SHPO), has determined that the project will have an adverse effect on...
Peacekeeper Program Component Effect Report #6 Missile Maintenance Facilities Modifications (1984)
The proposed Missile Maintenance Facilities (MMF) Modifications Component of the Peacekeeper Program consists of alterations and/or additions to the Missile Support Facility (Building 332), Missile Maintenance Shops (Building 336), and Missile Maintenance Support Facility (Building 340) located within the F.E. Warren Air Force Base (AFB) Historic District/National Landmark near Cheyenne, Wyoming. The Air Force, in consultation with the Wyoming State Historic Preservation Officer (SHPO), has...
Peacekeeper Program Cultural Resources Management Plan (1984)
The President has directed the Air Force to deploy the Peacekeeper missile system at a location near F.E. Warren Air Force Base (AFB), Cheyenne vicinity, Wyoming. The recently published Final Environmental Impact Statement (FEIS) for the Program describes the level and significance of impacts to cultural resources and specifies a series of "assumed mitigations" that the Air Force will develop and implement in order to minimize or avert such project-caused adverse effects. One of the central...
Peacekeeper Program Cultural Resources Technical Report 3: Southeastern Wyoming Prehistory, Volume 1 (1987)
The report is the result of efforts by a number of individuals from two different firms. URS-Berger began preliminary evaluation of cultural resources for the Peacekeeper Program in 1983. Archaeological survey, testing, and mitigation studies were conducted in 1984 and 1985. The analysis of site and artifact data was done in 1984 and 1985, and the draft prehistoric report was completed early in 1985. In March 1985, Tetra Tech, Inc. succeeded URS-Berger as the Air Force consultant, and some...
Peacekeeper Program: Preliminary Component Effect Report, Energy Management and Control System, F.E. Warren Air Force Base, Wyoming (1985)
As outlined in the Peacekeeper Program Cultural Resources Management Plan (U.S. Air Force 1984), the Air Force is preparing a series of Component Effect Reports (CERs) covering proposed actions required for system deployment. This document is an abbreviated report reviewing the Energy Management and Control System (EMCS) prior to the 30% design review. A complete CER will be produced after 30% design review when final plans are available. The EMCS component consists of installing fiber optic...