Report of Findings for the San Carlos Irrigation and Drainage District Phase 1 Eligibility Testing, Data Recovery, and Archival Research along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Pinal County, Arizona: Photo Log and Contact Sheets

Summary

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. Phase 2 of this project includes modification of the canal by widening segments of Reaches 1, 2, and 3 and lining those segments of the canal with concrete.

In 2013, the Bureau of Reclamation, Phoenix Area Office (Reclamation) directed Archaeological Consulting Services, Ltd. (ACS) to conduct a Class III inventory of the project alignment and prepare a treatment plan for eligibility testing at two sites (AZ U:15:5[ASM] and AZ U:15:47[ASM]), Phase 1 data recovery at three sites (Florence Ruin/AZ U:15:124[ASM], AZ U:15:663[ASM], and AZ U:15:678[ASM]/AZ U:15:5[ARS]) (Gregory et al. 2014b), and archival research was for three sites (Florence Canal/AZ AA:3:211[ASM]; a wagon road/AZ U:15:665[ASM]; and a historic structure/AZ U:15:666[ASM]). Two sites, AZ AA:3:215(ASM)/Florence-Casa Grande Canal and AZ U:15:676(ASM)/AZ U:15:1(REC), had been previously mitigated. No further work was required for AZ AA:3:215(ASM)/Florence-Casa Grande Canal, but limited boundary testing was recommended within the expanded site boundary of U:15:676(ASM)/AZ U:15:1(REC).

No features were identified at AZ U:15:5(ASM), AZ U:15:47(ASM), Florence Ruin/AZ U:15:124(ASM), or AZ U:15:678(ASM). Seventeen features were identified at AZ U:15:663(ASM) during Phase 1 data recovery. One feature, a cremation, was identified at AZ U:15:676(ASM). Because potentially significant subsurface features were discovered at AZ U:15:663(ASM), a targeted Phase 2 data recovery effort is recommended. In addition, because human remains were identified at AZ U:15:676(ASM), Phase 2 data recovery is recommended, as well as archaeological monitoring during ground disturbing activities associated with the project. At the request of Reclamation, a Phase 2 treatment plan was prepared as part of this document. The results of the archival research associated with the Florence Canal (AZ AA:3:211[ASM]), a wagon road (AZ U:15:665[ASM]), and a historic structure (AZ U:15:666[ASM]), as well as artifact analyses from Phase 1 investigations, are also included in the report.

This is the photo log and the contact sheets of photos taken during Phase 1 data recovery.

The report can be found at tDAR ID: 406057.

The ceramic analysis data can be found at tDAR ID: 406059.

The faunal analysis data can be found at tDAR ID: 406060.

The lithic analysis data can be found at tDAR ID: 406061.

The shell analysis data can be found at tDAR ID: 406062.

Cite this Record

Report of Findings for the San Carlos Irrigation and Drainage District Phase 1 Eligibility Testing, Data Recovery, and Archival Research along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Pinal County, Arizona: Photo Log and Contact Sheets. Walter R. Punzmann, Joanne C. Tactikos. 2016 ( tDAR id: 406058) ; doi:10.6067/XCV8V126PW

This Resource is Part of the Following Collections

Temporal Coverage

Calendar Date: 1857 to 1965 (Historic Period)

Calendar Date: 850 to 1150 (Sedentary)

Calendar Date: 950 to 1300 (Sedentary-Classic)

Spatial Coverage

min long: -111.542; min lat: 32.896 ; max long: -111.359; max lat: 33.017 ;

Record Identifiers

Arizona State Museum Burial Agreement Case(s): 2014-036

Archaeological Resources Protection Act (ARPA) Permit No.(s): 2014/ACS/SCIP/WRO/001a

Arizona Antiquities Act Project Specific Permit No.(s): 2014-098ps

Archaeological Consulting Services, Ltd. Project No.(s): 13-107

Bureau of Reclamation Contract No.(s): R13PB32022

File Information

  Name Size Creation Date Date Uploaded Access
Florence_Canal_Testing_Photolog_ContactSheets.pdf 27.94mb Jun 14, 2016 Jun 30, 2016 12:31:35 PM Confidential