Phase 2: Reaches 1, 2, and 3 Rehabilitation
Part of: San Carlos Irrigation and Drainage District (SCIDD) Rehabilitation Project
This collection encompasses archaeological survey, archival research, Phase 1 data recovery, and Phase 2 data recovery conducted prior to the relining and rehabilitation of Reaches 1, 2, and 3 of the San Carlos Irrigation and Drainage District Rehabilitation Project. Reaches 1, 2, and 3 comprise the second phase of the San Carlos Irrigation and Drainage District Rehabilitation Project, which was authorized under the Arizona Water Settlements Act of 2004. The Bureau of Reclamation is the lead federal agency for the environmental and cultural compliance process. The project proponent is the San Carlos Irrigation and Drainage District. Cooperating agencies and entities include the Bureau of Indian Affairs, the San Carlos Irrigation Project, and the Pima-Maricopa Irrigation Project.
Site Name Keywords
AZ U:15:663(ASM) •
AZ U:15:124(ASM) •
Florence-Casa Grande Canal •
AZ U:15:47(ASM) •
Florence Canal •
AZ U:15:665(ASM) •
AZ AA:3:211(ASM) •
AZ AA:3:215(ASM) •
AZ U:15:667(ASM) •
AZ AA:2:130(ASM)
Site Type Keywords
Resource Extraction / Production / Transportation Structure or Features •
Agricultural or Herding •
Archaeological Feature •
Artifact Scatter •
Canal or Canal Feature •
Water Control Feature •
Road, Trail, and Related Structures or Features •
Road •
Non-Domestic Structures •
Domestic Structure or Architectural Complex
Other Keywords
Standing Structure
Culture Keywords
Historic •
Hohokam •
Euroamerican •
Archaic
Investigation Types
Historic Background Research •
Archaeological Overview •
Data Recovery / Excavation •
Architectural Survey •
Reconnaissance / Survey •
Records Search / Inventory Checking •
Site Evaluation / Testing •
Systematic Survey •
Architectural Documentation •
Ground Disturbance Monitoring
Material Types
Ceramic •
Chipped Stone •
Glass •
Metal •
Ground Stone •
Building Materials •
Fauna •
Human Remains •
Shell •
Wood
Temporal Keywords
Ceramic Period •
Historic Period •
Pioneer Period •
Classic Period •
Protohistoric Period •
Euro-American •
Historic Euro-American •
Colonial Period •
Sedentary Period •
Late Historic period
Geographic Keywords
Arizona (State / Territory) •
United States of America (Country) •
Pinal County (County) •
North America (Continent) •
USA (Country) •
Pinal County, AZ •
San Carlos Irrigation and Drainage District •
Picacho Reservoir •
Central Pinal County •
Coolidge, Pinal County, Arizona
Resources Inside This Collection (Viewing 1-5 of 5)
There are 5 Projects within this Collection [remove this filter]
-
China Wash Flume Historic American Engineering Record, Pinal County, Arizona
PROJECT
The San Carlos Irrigation and Drainage District (SCIDD) is undertaking a 10-year Rehabilitation project of the National Register of Historic Places (NRHP)-eligible Florence-Casa Grande (FCG) Canal (also known as the Main Canal/AZ AA:3:215[ASM]) in Pinal County, Arizona. The canal, which is currently operated and maintained by SCIDD, was constructed by the U.S. Bureau of Indian Affairs and Bureau of Reclamation (Reclamation) between 1923 and 1928 and incorporated into the San Carlos Irrigation...
-
Class III Survey of Expanded Area of Potential Effect for the San Carlos Irrigation Project Rehabilitation of Reaches 1, 2, and 3
PROJECT
As authorized under the Arizona Water Settlements Act of 2004, the San Carlos Irrigation and Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The Bureau of Reclamation, Phoenix Area Office (Reclamation) directed Archaeological Consulting...
-
Cultural Resources Investigations along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Florence, Arizona
PROJECT
In accordance with the provisions of the 2004 Arizona Water Settlement Act, the Bureau of Reclamation, Phoenix Area Office (PXAO) assisted the San Carlos Irrigation and Drainage District (SCIDD) in the preparation of an environmental assessment (EA) prior to the rehabilitation of portions of the San Carlos Irrigation Project, a Bureau of Indian Affairs water delivery system that serves both the Gila River Indian Community and SCIDD. The project area extends along the current and realigned...
-
Final Report of Class III Cultural Resource Survey for the SCIDD-Florence Canal, Phase I
PROJECT
As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The Bureau of Reclamation, Phoenix Area Office (Reclamation) directed Archaeological Consulting...
-
Phase 1 Eligibility Testing, Data Recovery, and Archival Research along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Pinal County, Arizona
PROJECT
As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. Phase 2 of this project includes modification of the canal by widening segments of Reaches 1, 2, and...