San Xavier Farm Rehabilitation Project

Part of: USDI Bureau of Reclamation, PXAO, Tohono O'Odham Nation, San Xavier District

Reclamation is assisting the San Xavier District and the San Xavier Farm Cooperative in the extensive rehabilitation of approximately 1,700 acres of active and fallow farmland along the Santa Cruz River at San Xavier. While some present and former fields will be modified to better accommodate water application from various water delivery systems, the major impacts to fields and some adjacent lands will be from installation of water pipelines and vaults; construction of drainage channels and dikes, including an extension to the west of the existing Arizona Department of Transportation (ADOT) dike at Interstate 19 (I-19) at the Papago Interchange; and possible tree planting or farming in Field 34 near the southbound ramp of I-19. The project area is located just south of Tucson and west of the Tucson International Airport, and is generally bounded by Valencia Road to the north, the Santa Cruz River and I-19 to the east, the Papago Interchange to the south, and Mission Road and Black Mountain to the west.


Resources Inside This Collection (Viewing 1-22 of 22)

Class III Pedestrian Survey, Shovel Probe Testing, Limited Nonsite Backhoe Trenching, and Magnetometer Sampling for the San Xavier District Farm Rehabilitation Project, Tohono O’odham Nation, Pima County, Arizona Intensive Testing for the San Xavier Farm Rehabilitation Project, San Xavier District, Tohono O'odham Nation, Pima County, Arizona Monitoring of a Sinkhole Excavation and Repair Prior to the San Xavier Farm Rehabilitation Project Testing
  • Monitoring of a Sinkhole Excavation and Repair Prior to the San Xavier Farm Rehabilitation Project Testing
    PROJECT USDI Bureau of Reclamation, Phoenix Area Office.

    This project is part of the San Xavier Farm Rehabilitation Project. Additional entries related to this project can be found at the following link: https://core.tdar.org/collection/27482 The Bureau of Reclamation (Reclamation) is providing funding and technical assistance for farm improvements on the San Xavier District of the Tohono O’odham Nation. Since previous cultural resource investigations identified buried archaeological features and deposits in the vicinity, it was anticipated that...

  • Monitoring of a Sinkhole and Repair Prior to the San Xavier Rehabilitation Project Testing: Photo Log (2004)
    DOCUMENT Full-Text Archaeological Consulting Services, Ltd..

    This is part of the San Xavier Farm Rehabilitation Project. Additional entries related to this project can be found at the following link: https://core.tdar.org/collection/27482 The Bureau of Reclamation (Reclamation) is providing funding and technical assistance for farm improvements on the San Xavier District of the Tohono O’odham Nation. Since previous cultural resource investigations identified buried archaeological features and deposits in the vicinity, it was anticipated that...

  • Monitoring of a Sinkhole and Repair Prior to the San Xavier Rehabilitation Project Testing: Photos (2004)
    IMAGE Archaeological Consulting Services, Ltd.. Lisa Champagne. Kristin L. Fangmeier.

    This is part of the San Xavier Farm Rehabilitation Project. Additional entries related to this project can be found at the following link: https://core.tdar.org/collection/27482 The Bureau of Reclamation (Reclamation) is providing funding and technical assistance for farm improvements on the San Xavier District of the Tohono O’odham Nation. Since previous cultural resource investigations identified buried archaeological features and deposits in the vicinity, it was anticipated that...

Monitoring Plan for the Construction Phase of the San Xavier Farm Rehabilitation Project, San Xavier District, Tohono O’odham Nation Individual Resources Research Design and Work Plan for Intensive Testing of the San Xavier Farm Rehabilitation Project, San Xavier District, Tohono O’odham Nation, Pima County, Arizona