USA (Country) (Geographic Keyword)
27,601-27,625 (35,822 Records)
Tetra Tech EC, Inc. (TtEC), conducted a Phase I and II archeological survey of the project area for the proposed replacement of Brindle Lake Dam, under contract to Fort Dix. The structure is a low earth dam on Brindletown Creek on the Fort Dix Military Reservation in the Township of Plumsted, Ocean County, New Jersey. The project’s area of potential effects (APE) covers an area of 5.5 acres (2.3 hectares) and includes the dam, two laydown areas, and access roads. A portion of the project area...
Phase I and II Investigations at Shaw Air Force Base and Poinsett Range
These documents represent the results of Phase II archaeological testing of three sites: 38SU58, 38SU191 and 38SU222 as well as the results of a Phase I survey of three tracts. The tested sites all contained prehistoric cultural materials date to the Archaic, Woodland and Mississippian periods. Site 38SU58 was determined to be not eligible for nomination to the National Register of Historic Places, while sites 38SU191 and 38SU222 were determined to be eligible. The Phase I survey revisited one...
Phase I and II Investigations, State Route 3003 Relocation Along Georges Creek 1995, Nicholson Township, Fayette County, Pennsylvania (1995)
In 1993, the U.S. Army Corps of Engineers Pittsburgh District conducted Phase I and II investigations in the State Route 3003 relocation project area, situated along Georges Creek in Nicholson Township, Fayette County, Pennsylvania. These investigations identified five historic period resources, including two house foundations and associated wells, a grist mill foundation, a timber dam foundation, and a Works Progress Administration stone retaining wall. The highway relocation project will...
Phase I and Phase II Archaeological Data Recovery at Five Sites for the Pinal West to Pinal Central Extra-High Voltage Transmission Line Project, near Casa Grande, Pinal County, Arizona (2013)
Salt River Project Agricultural Improvement and Power District (SRP) has planned and partially constructed an 88-mile-long 500-kV extra-high-voltage transmission line linking the Pinal West, Duke, Pinal Central, Abel, and Dinosaur substations (Arizona Corporate Commission Certificate of Environmental Compatibility, Case No. 126) in south-central Arizona. The transmission line between the Dinosaur and proposed Pinal Central substations has already been constructed; the portion connecting the...
Phase I and Phase II Archaeological Investigations, Avon Park Air Force Range, Polk and Highlands Counties, Florida (2008)
This report presents the results of Phase I and Phase II archaeological investigations on Avon Park Air Force Range (APAFR) in Polk and Highlands counties, Florida. This work was conducted by Geo-Marine, Inc. (GMI) under a contract (DACA63-00-D-0006, Delivery Order 0036) with the U.S. Army Corps of Engineers, Fort Worth District, acting on behalf of the Air Combat Command (ACC) and APAFR. The purpose of this study is to provide the APAFR with data for use in the management of its cultural...
A Phase I Archaeological Assessment of the NOTU Site, 8BR01641, Brevard County, Florida (2006)
The Economic Development Commission of Florida’s Space Coast has contracted with PBS&J to conduct a Phase I Archaeological Assessment of Site 8BR01641 at Cape Canaveral Air Force Station (CCAFS) in Brevard County, Florida. The purpose in visiting this site was to ascertain the extent, nature, and integrity of site 8BR01641, and to determine National Register of Historic Places (National Register) eligibility documents associated with the NOTU Site (8BR01641). This archaeological assessment...
Phase I Archaeological Investigation Curation Inventory, Ballast House, 2000.029_0005 (1990)
This is the Adelphi Research Laboratories curation inventory list for the phase I investigation completed at the Blossom Point Farmhouse, site 18CH216.
Phase I Archaeological Investigation of 2,707.47 Acres on Avon Park Air Force Range, Polk and Highlands Counties, Florida (2012)
This report presents the results of Phase I archaeological investigations of 2707.47 acres on Avon Park Air Force Range (APAFR) in Polk and Highland counties, Florida. The purpose of this study is to provide the APAFR with data for use in the management of its cultural resources in partial fulfillment of its obligations under the National Historic Preservation Act and other applicable cultural resources legislation. The Phase I survey resulted in the discovery of ten newly identified...
Phase I Archaeological Investigations at Naval Station, Annapolis (2006.026)
This project contains artifact inventories and project report from sites 18AN1126, 18AN1127, 18AN1128, and 18ANX149 identified during phase I investigations at Naval Station, Annapolis. This project contains the following resources: artifact inventories, site report.
Phase I Archaeological Investigations, Point Lookout Light Station, Point Lookout, MD (2000.019)
This project contains an official report, an artifact distribution table, and an excavation drawing from the Phase I archaeological investigations conducted between February 15 and May 23, 1995 on the U.S. Navy property at Point Lookout, Maryland (18ST61), and on three small Navy-owned tracts located along the Chesapeake Bay between Point Lookout and the Naval Air Station Patuxent River. These four properties presently function as radar installations or theodolite stations. Additional...
Phase I Archaeological Investigations, Webster Field Annex, Naval Air Station Patuxent River, Maryland (2000.016)
This project contains shovel test pit maps, an artifact catalog, and a final report for multiple sites identified during the 1996 Webster Field Survey, Webster Field Annex, Naval Air Station Patuxent River, St. Mary's County, Maryland. This collection and related materials are now located at the Maryland Archaeological Conservation Laboratory (MAC Lab). Additional resources related to this project are also located at the MAC Lab. For further information and access to resources contact the MAC...
Phase I Archaeological Reconnaissance Survey for Cultural Resources of 184 HA (455 Acres) On Industrial Site A, 162 HA (400 Acres) on Industrial Site B, and 0.7 HA (1.7 Acres) at the Location of the Trenton Transition Test Cells W1 and W2, Arnold Engineering Development Center, Arnold Air Force Base, Coffee and Franklin Counties, Tennessee (1995)
This project was completed in fall of 1994 in support of the construction of several facilities. It included the examination of three different areas, 455 acres in Industrial Site A, 400 acres in Industrial Site B, and a small 1.7-acre tract. The investigators included a geomorphologist who judged that 20% of the surface of the project areas was highly disturbed. Investigators conducted a pedestrian survey of the areas and conducted shovel testing at 30 and 15 m intervals in vegetated areas. A...
Phase I Archaeological Reconnaissance Survey for Cultural Resources of Selected Areas with the Former Camp Forrest World War II Military Training Base, Arnold Air Station, Coffee and franklin Counties, Tennessee (1995)
From July 7 to August 11, 1994, archaeologists from the Transportation Center at The University of Tennessee-Knoxville conducted a Phase I archaeological reconnaissance survey for cultural resources of selected areas within the former Camp Forrest training base in Coffee and Franklin counties, Tennessee. The locations examined were limited primarily to long narrow corridors along roads. Work included a pedestrian walk-over of all areas and shovel testing at 30m and 15m intervals. A total of...
Phase I Archaeological Resource Survey, Jonah E. Kelley U.S. Army Reserve Center, Joint Base McGuire-Dix-Lakehurst, Burlington County, New Jersey (2013)
Commonwealth Cultural Resources Group, Inc. (CCRG) conducted a Phase I Archaeological Resource Survey of approximately 19-acres (7.7- hectares) at the Jonah E. Kelley United States Army Reserve Center (Kelley USARC) located along State Road 68, on the Joint Base McGuire-Dix-Lakehurst (JBMDL), Burlington County, New Jersey. Previously, in 2004, Kise Straw and Kolodner, Inc. (KSK) conducted a Phase I Archaeological Survey for the United States Army Training Center at Fort Dix, which included the...
Phase I Archaeological Sensitivity Investigation (High Sensitivity Zones) Fort Dix Military Installation, Burlington and Ocean Counties, New Jersey: Subsurface Testing Inventory (1998)
This summary report describes archaeological survey work and supporting analysis undertaken at Fort Dix in 1997-8 under Delivery Order 41 of Contract DACW61-61-D-0010 between Hunter Research Inc. and the Philadelphia District, U.S. Army Corps of Engineers. This Task Order envisaged a Phase I identification level survey of high and low archaeological sensitivity areas, directed chiefly at the location and preliminary characterization of prehistoric resources at Fort Dix. This document contains...
Phase I Archaeological Sensitivity Investigation Fort Dix Military Installation, Burlington and Ocean Counties, New Jersey: Management Summary of Work Completed in 1997-8 (Task Order 3) (1998)
This summary report describes archaeological survey work and supporting analysis undertaken at Fort Dix in 1997-8 under Delivery Order 41 of Contract DACW61-61-D-0010 between Hunter Research Inc. and the Philadelphia District, U.S. Army Corps of Engineers. This Delivery Order implemented Task Order Number 3, issued by the Historic Preservation Office, Environmental Division, Directorate of Public Works, U.S. Army Fort Dix on February 27 1997. Delivery Order 41 was administered by the New York...
Phase I Archaeological Survey Along State Route 127 on Arnold Air Force Base (2013)
Summary of archaeological investigations in support of proposed road improvements for a section of for a section of State Route 127, including a small portion that extends onto Arnold Air Force Base (Arnold AFB). Investigations included a review of the existing site records, pedestrian survey, visual inspection and shovel testing. The records search indicated 11 sites located within one mile of the project area with two sites recorded in the immediate project location. All but one of these sites...
Phase I Archaeological Survey and Limited Phase II Archaeological Testing of Select Timber Harvest Areas at Arnold Air Force Base (AEDC), Coffee and Franklin Counties, Tennessee (1996)
This project was conducted in the late summer/early fall of 1996. The areas examined were dispersed over 25 separate tracts, totaling 468 acres. Survey methodology included pedestrian survey and randomly placed shovel tests (50 cm in diameter). This effort provided photo documentation for some elements of the Camp Forrest archaeological record and also recorded one archaeological site, 40FR209, a historic site estimated to have been occupied during the late nineteenth-early twentieth...
Phase I Archaeological Survey Management Unit 10A, Avon Park Air Force Range, Avon Park, Florida (1998)
This survey consisted of a Phase I archaeological survey of Management Unit 1 OA, ca. 3,400 acres, located in the extreme southeast comer of the facility. The purpose of the survey was to assist APAFR in compliance with Sections 106 and 110 of the National Historic Preservation Act of 1966, as amended, and various Air Force regulations. Topographic relief is minimal and open hammocks and grasslands are the dominant vegetation in the vicinity of the river. Various flatwood communities dominate~...
Phase I Archaeological Survey Management Units 1,2,7,8,11,11A,12, and 13, Avon Park Air Force Range, Avon Park, Florida (1999)
In a continuing effort to comply with Section 110 of the National Historic Preservation Act of 1966, as amended, Avon Park Air Force Range, Florida, conducted two Phase I archaeological surveys, in the Fall of 1998 and in the Spring of 1999. The surveys were contracted through Air Combat Command, Langley AFB, Virginia, and Moody AFB, Georgia. One survey, conducted in November and December of 1998, investigated a 5,700 acre (2,307 hectare) portion of Management Units 1 and 2. The second survey...
Phase I Archaeological Survey NRO Substation at Cape Canaveral Air Force Station, Brevard County, Florida. (2006)
From Moy 1 through 5, 2006, New South Associates (NSA) conducted a Phase 1 Cultural Resource Assessment Survey Phase 1 Cultural Resource Assessment Survey of the proposed location for the NRO Substation at Cope Canaveral Air Force Station (CCAFS).This study included background research and a field phase of intensive shovel testing. The background research was conducted to gain on understanding of environmental and cultural aspects of the project area and to aid in predicting the nature,...
Phase I Archaeological Survey of 1835 Acres, Avon Park Air Force Range, Avon Park, Florida (2003)
Parsons, Inc. (Parsons) was contracted by Headquarters Air Combat Command (HQ ACC) on behalf of Avon Park Air Force Range (APAFR), Florida and Moody Air Force Base (AFB), Georgia to conduct a Phase I archaeological survey of approximately 1,835 acres (743 hectares). The purpose of the survey was to assist APAFR in compliance with Section 110 of the National Historic Preservation Act (NHPA) of 1966, as amended; Air Force Instruction 32-7065; and other state, federal, and Department of Defense...
Phase I Archaeological Survey of 2,400 Acres and Phase II NRHP Evaluations of Eight Sites Joint base McGuire-Dix-Lakehurst, Burlington County, New Jersey (2022)
This report presents the results of Phase I archaeological survey within 2,400 acres and Phase II NRHP eligibility testing of eight archaeological sites by Versar, Inc. at JB MDL. Fieldwork was conducted between April 22 and December 22, 2019. In total, 1,472 shovel tests were excavated during the current investigation: 1,237 shovel tests within block shovel test areas and 235 shovel tests within point survey areas. Seven previously unrecorded sites were documented: one prehistoric, three...
Phase I Archaeological Survey of 250 Acres at the Arnold Engineering and Development Center, Coffee County, Tennessee (1994)
This report presents the results of an intensive Phase I archeological survey of the Rowland Creek and the ASTF Laydown ADJ Par Course survey tracts totaling 250 acres at the Arnold Engineering and Development Center in Coffee County, Tennessee. The purpose of the survey was to determine the potential impact that future construction would have on any previously unidentified cultural resources in the area. The results of the background research and the intensive survey of the Rowland Creek and...
Phase I Archaeological Survey of 4,147.1 acres, and Phase II Site Evaluations at 8HG24, 8HG767, and 8PO3405, Avon Park Air Force Range, Polk and Highlands Counties, Avon Park, Florida (2005)
In 2004, Headquarters Air Combat Command (HQ ACC) conducted a Phase I archaeological survey and Phase II evaluations at three previously documented sites within the boundaries of Avon Park Air Force Range (APAFR). Between January 5, 2004 and February 27, 2004, a pedestrian and shovel test survey was completed of approximately 4,147.1 acres (1,678.3 ha) in the central part of the property. The acreage was stratified as high, medium, and low probability areas, as defined by a previously prepared...