Air Force - West


Resources Inside This Collection (Viewing 4,701-4,800 of 6,280)


  1. Research Design and Work Plan for a Cultural Resource Survey and NRHP Eligibility Assessment of 100 Acres on Cannon Air Force Range, Curry County, New Mexico (2015)
  2. Research Design and Work Plan: Data Recovery Investigations at Seven Archaeological Sites in the Proposed Atlas Photovoltaic Development Footprint, Holloman Air Force Base, Otero County, New Mexico (2015)
  3. Research Design Archaeological Characterization Sampling For the EC South Range, Nevada Test and Training Range, Nellis Air Force Base (2008)
  4. Research Design For An Archaeological Characterization Study On Portions of Belted Range and Kawich Valley (Range 74) Nevada Test and Training Range (2009)
  5. A Research Design to Conduct an Archaeological Characterization Study of the Belted Range and Southern Kawich Valley, Nevada Test and Training Range, Nellis Air Force Base (2010)
  6. Research Design to Mitigate the Adverse Effect on NM 0:3:1:11 (LA 87432), Kirtland Air Force Base (1981)
  7. Reservation Boundary and Land Use, Master Plan, Fort Sam Houston, Texas (1955)
  8. Resolution of the Tohono O'odham Legislative Council (Opposition on use of the Nation's Air Space and Aboriginal Lands by the United States Air Force) (2000)
  9. Resources Impact Survey for the Mare Tank F-16 Mishap, Sierra County, NM (2016)
  10. Response Draft from Scott Shepherd to Cantu, Building 907 Doors at North and South Basement Entrances, Randolph Air Force Base, Texas (2008)
  11. Response Draft from Scott Shepherd to Moore, Building 907 Screen Guards, Randolph Air Force Base, Texas (2008)
  12. Response from 902 MSG/CEAN to 12 MSG/CEO, Exterior Awnings Hangar 62, Randolph Air Force Base, Texas (2011)
  13. Response from Amy Dase to Joseph Logan, AF Building 208, Randolph Air Force Base, Texas (1992)
  14. Response from Amy Dase to Joseph Logan, Building 675, Randolph Air Force Base, Texas (1992)
  15. Response from Brian Miller to Claudia Nissley, Off-Street Parking Areas, Randolph Air Force Base, Texas (1996)
  16. Response from Brian Miller to Claudia Nissley, Off-Street Parking Areas, Randolph Air Force Base, Texas (1996)
  17. Response from Brian Miller to Claudia Nissley, Pre-cast Concrete Fence Plan, Randolph Air Force Base, Texas (1996)
  18. Response from Brian Miller to Curtis Tunnell, Pre-cast Concrete Fence Plan, Randolph Air Force Base, Texas (1996)
  19. Response from Brian Miller to Curtis Tunnell, Request for Reconsideration of Determination for Off-Street Parking Area, Randolph Air Force Base, Texas (1996)
  20. Response from Caroline Wright to David Brigham, Project Review of the Proposed Work at Camp Bullis, Bexar County, Texas (2008)
  21. Response from Caroline Wright to James Graham, Proposed Deconstruction of Building 293, Fort Sam Houston, Texas (2010)
  22. Response from Caroline Wright to Leon Spradling, Project Review for New Static Airplane Display, Randolph Air Force Base, Texas (2010)
  23. Response from Claudia Nissley to Donald Peterson, Rehabilitation of Building 216, Randolph Air Force Base, Texas (1992)
  24. Response from Claudia Nissley to Donald Peterson, Rehabilitation of Building 661, Randolph Air Force Base, Texas (1992)
  25. Response from Claudia Nissley to Donald Peterson, Rehabilitation of Building 901, Randolph Air Force Base, Texas (1992)
  26. Response from Claudia Nissley to Donald Peterson, Rehabilitation of Building 902, Randolph Air Force Base, Texas (1992)
  27. Response from Claudia Nissley to Donald Peterson, Rehabilitation of Building 902, Randolph Air Force Base, Texas (1992)
  28. Response from Claudia Nissley to Harry Finke, Replacement of Windows Buildings 661 and 675, Randolph Air Force Base, Texas (1992)
  29. Response from Claudia Nissley to Joseph Logan, Interior Rehabilitation of Hangar 12, Randolph Air Force Base, Texas (1992)
  30. Response from Claudia Nissley to Joseph Logan, Proposed Rehabilitation of Building 208, Randolph Air Force Base, Texas (1992)
  31. Response from Claudia Nissley to Joseph Logan, Proposed Rehabilitation of Building 663, Randolph Air Force Base, Texas (1992)
  32. Response from Claudia Nissley to Joseph Logan, Proposed Rehabilitation of North Wing Building 661, Randolph Air Force Base, Texas (1993)
  33. Response from Claudia Nissley to Joseph Logan, Rehabilitation of Building 216, Randolph Air Force Base, Texas (1992)
  34. Response from Claudia Nissley to Joseph Logan, Rehabilitation of Building 675 A Wing, Randolph Air Force Base, Texas (1992)
  35. Response from Claudia Nissley to Joseph Logan, Rehabilitation of Hangar 13, Randolph Air Force Base, Texas (1992)
  36. Response from Claudia Nissley to Joseph Logan, Window Replacement Project Building 661, Randolph Air Force Base, Texas (1991)
  37. Response from Claudia Nissley to Richard Booher, Proposed Cleaning and Stabilization of Building 614, Fort Sam Houston, Texas (1991)
  38. Response from Curtis Tunnell to Elton Prewitt, Camp Bullis Investigations, Report, and Related Correspondence, Camp Bullis, Texas (1990)
  39. Response from Demetrio Jimenez to Emmitt Smith, Building 526, Randolph Air Force Base, Texas (1993)
  40. Response from Demetrio Jimenez to Emmitt Smith, Building 581, Randolph Air Force Base, Texas (1993)
  41. Response from Demetrio Jimenez to Emmitt Smith, Building 661, Randolph Air Force Base, Texas (1993)
  42. Response from Demetrio Jimenez to John Brenneman, Armory Building Construction, Camp Bullis, Texas (1994)
  43. Response from Demetrio Jimenez to John Brenneman, Building 131 50 Percent Level Plans, Fort Sam Houston, Texas (1994)
  44. Response from Demetrio Jimenez to John Brenneman, Building 2194 Water Plant, Fort Sam Houston, Texas (1994)
  45. Response from Demetrio Jimenez to John Brenneman, Building 2792 Wallpaper and Paint, Fort Sam Houston, Texas (1994)
  46. Response from Demetrio Jimenez to John Brenneman, Buildings 122, 124, and 125, Fort Sam Houston, Texas (1994)
  47. Response from Demetrio Jimenez to John Brenneman, Ceiling Fans in Fifteen Quarters on Staff Post, Fort Sam Houston, Texas (1994)
  48. Response from Demetrio Jimenez to John Brenneman, Design of Eisenhower National Bank 95 Percent Plans, Fort Sam Houston, Texas (1994)
  49. Response from Demetrio Jimenez to John Brenneman, Design of Eisenhower National Bank, Fort Sam Houston, Texas (1993)
  50. Response from Demetrio Jimenez to John Brenneman, Form 1391 for Building 2376 Beach Pavilion, Fort Sam Houston, Texas (1994)
  51. Response from Demetrio Jimenez to John Brenneman, Officers' Club Alterations Proposal, Fort Sam Houston, Texas (1994)
  52. Response from Demetrio Jimenez to John Brenneman, Raven Room Canopy Installation, Fort Sam Houston, Texas (1994)
  53. Response from Demetrio Jimenez to John Brenneman, Temporary Building, Fort Sam Houston, Texas (1994)
  54. Response from Department of the Air Force to Naval Civilian Personnel Data System Center, Confirmation of Initial Request for Construction of Additional Office Space, Randolph Air Force Base, Texas (1991)
  55. Response from Department of the Air Force to Naval Civilian Personnel Data System Center, Initial Request for Construction of Additional Office Space, Randolph Air Force Base, Texas (1991)
  56. Response from Don Klima to John Brenneman, Demolition and Replacement of Building 2791, Fort Sam Houston, Texas (1997)
  57. Response from Don Klima to John Brenneman, Demolition of Building 238, Fort Sam Houston, Texas (1997)
  58. Response from Don Klima to Leonard Patrick, Building 900 Construction of Exterior Elevator, Randolph Air Force Base, Texas (2000)
  59. Response from Donald Peterson to Curtis Tunnell, Building 902 Alterations, Randolph Air Force Base, Texas (1991)
  60. Response from Donald Peterson to Curtis Tunnell, Renovation of Building 902, Randolph Air Force Base, Texas (1992)
  61. Response from Douglas Biggerstaff to Lawerence Oaks, Lease of Building 259, Fort Sam Houston, Texas (2002)
  62. Response from Elizabeth Butman to Michael Grizer, Project Review of Proposed Rehabilitation of Building 133, Fort Sam Houston, Texas (2012)
  63. Response from Elton Prewitt to James Steely, PAI Reports of Investigations No. 75, Camp Bullis, Texas (1990)
  64. Response from Emmitt Smith to Curtis Tunnell, Building 526, Randolph Air Force Base, Texas (1993)
  65. Response from F. Lawerence Oaks to Allen Benefield, Project Review for Cold War-Era Building and Structure Inventory and Assessment, Randolph Air Force Base, Texas (2003)
  66. Response from F. Lawerence Oaks to Bruce R. Nadler, Project Review of New Canopy and Alterations to Hangar 63, Randolph Air Force Base, Texas (2004)
  67. Response from F. Lawerence Oaks to Colonel Patrick, Project Review of Flagstone Sidewalks, Randolph Air Force Base, Texas (1999)
  68. Response from F. Lawerence Oaks to David Brigham, Project Review Determination for Rehabilitation of Building 128 (2002)
  69. Response from F. Lawerence Oaks to David Brigham, Project Review for Rehabilitation of Building 128, Fort Sam Houston, Texas (2002)
  70. Response from F. Lawerence Oaks to David Brigham, Project Review for Rehabilitation of Building 2000-2001, Fort Sam Houston, Texas (2002)
  71. Response from F. Lawerence Oaks to David Brigham, Project Review for Rehabilitation of Building 2264, Fort Sam Houston, Texas (2002)
  72. Response from F. Lawerence Oaks to David Brigham, Project Review for Rehabilitation of Theatre 1 Building 2270, Fort Sam Houston, Texas (2002)
  73. Response from F. Lawerence Oaks to David Brigham, Project Review Revise for Rehabilitation of Building 2000-2001, Fort Sam Houston, Texas (2002)
  74. Response from F. Lawerence Oaks to David Brigham, Rehabilitation of Building 128, Fort Sam Houston, Texas (2003)
  75. Response from F. Lawerence Oaks to Douglas A. Biggerstaff, Project Review for the Lease of Buildings 1000, 2371, and 2372, Fort Sam Houston, Texas (2003)
  76. Response from F. Lawerence Oaks to Douglas Biggerstaff, Draft Memorandum of Agreement for the Demolition of Buildings 376, 377, 4115, and 5102, Fort Sam Houston and Camp Bullis, Texas (2001)
  77. Response from F. Lawerence Oaks to Douglas Biggerstaff, Environmental Assessment Document for New Housing Construction in Patch-Chaffee Area, Fort Sam Houston, Texas (2000)
  78. Response from F. Lawerence Oaks to Douglas Biggerstaff, Memorandum of Agreement Building 5002, Camp Bullis, Fort Sam Houston, Texas (2002)
  79. Response from F. Lawerence Oaks to Douglas Biggerstaff, MOA on Demolition of Building 1030, Fort Sam Houston, Texas (2000)
  80. Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review for Building 1030 HABS Documentation, Fort Sam Houston, Texas (2003)
  81. Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review for Construction of Dining Facility within Conservation District, Fort Sam Houston, Texas (2001)
  82. Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review for NEPA Final Draft Including Proposed Demolition of Buildings 238 and 240, Fort Sam Houston, Texas (2003)
  83. Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review for Pending Environmental Assessment of Proposed Access Control Measures, Fort Sam Houston, Texas (2003)
  84. Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review for Proposed Demolition of Buildings 238 and 240, Fort Sam Houston, Texas (2003)
  85. Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review for Proposed New Bollards to Replace Temporary Barriers, Fort Sam Houston, Texas (2003)
  86. Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review for Proposed Security Gate in Old Austin Road/Dickman Area, Fort Sam Houston, Texas (2003)
  87. Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review for Proposed Security Gate in Old Austin Road/Dickman Area, Fort Sam Houston, Texas (2003)
  88. Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review for Proposed Switching Facility in Expanded NHL District, Fort Sam Houston, Texas (2003)
  89. Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review for Proposed Undertaking to Demolish Building 5101, Camp Bullis, Fort Sam Houston, Texas (2002)
  90. Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review for Proposed Undertaking to Demolish Buildings 5101 and 5002, Camp Bullis, Fort Sam Houston, Texas (2002)
  91. Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review of Rehabilitation of Building 2264, Fort Sam Houston, Texas (2001)
  92. Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review of Report for the Stabilization of the Gift Chapel Building 2200, Fort Sam Houston, Texas (2000)
  93. Response from F. Lawerence Oaks to Douglas Biggerstaff, Proposal for Privatization of Water Supply of Fort Sam Houston and Camp Bullis, Texas (2000)
  94. Response from F. Lawerence Oaks to Douglas Biggerstaff, Proposed Demolition of Buildings 238 and 240, Fort Sam Houston, Texas (2002)
  95. Response from F. Lawerence Oaks to Douglas Biggerstaff, Review of Lease Agreement for Building 259, Fort Sam Houston, Texas (2002)
  96. Response from F. Lawerence Oaks to Douglas Biggerstaff, Review of Lease Agreement for Building 259, Fort Sam Houston, Texas (2003)
  97. Response from F. Lawerence Oaks to Douglas Biggerstaff, Review of Lease Agreements for Brooke Army Medical Center and Beach Pavilion North and South Buildings, Fort Sam Houston, Texas (2002)
  98. Response from F. Lawerence Oaks to Garry Atkins, Project Review for 65 Percent Construction Document Submittal for Proposed Rehabilitation of Building 2270 Theater 1, Fort Sam Houston, Texas (2005)
  99. Response from F. Lawerence Oaks to Garry Atkins, Project Review for Proposed Demolition of Building 330 Due to PCE Contamination, Fort Sam Houston, Texas (2005)
  100. Response from F. Lawerence Oaks to Garry Atkins, Project Review for Proposed Demolition of Building 330 Due to PCE Contamination, Fort Sam Houston, Texas (2005)