Browse all Documents in tDAR
-
Resource Inventory of 1052 Ac For Silver City-Grant County For Grant County (1984)
-
Resource Inventory, Angel Island State Park, General Description (1977)
-
Resource Inventory-Galbraith Lake (1979)
-
Resource Management and Locational Strategies of Certain Prehistoric Sites in Central Texas (1974)
-
Resource Management and Scientific Research at Pearl Harbor National Memorial (2020)
-
Resource Management Needs For Curecanti Recreatin Area (1979)
-
Resource Management Plan and Environmental Assessment (1981)
-
Resource Management Plan Guidance for the Sheep Creek Area (1997)
-
Resource Management Plan Harpers Ferry National Historical Park (1981)
-
Resource Management Plan, Cultural Component, Devils Tower National Monument, Wyoming (1984)
-
Resource Management Plan: Harpers Ferry National Historical Park (1981)
-
Resource Managers: North American and Australian Hunter-Gatherers (1982)
-
Resource Natural Gas Pipeline (1989)
-
Resource Natural Gas Pipeline (1989)
-
Resource Networks of Sanxingdui (2024)
-
Resource Overview Proposed All American Pipeline For Applied Conservation Tech (1984)
-
Resource Procurement at the Local Level in Classic Maya Chinikihá (AD 600-900) (2015)
-
Resource Protection Planning Process (RP-3) -- Early / Middle Archaic Study Unit: Lower Wabash, Green, Salt, Kentucky and Licking River Drainages
-
Resource Protection Planning Process (RP-3) -- Early / Middle Archaic Study Unit: Middle Ohio River Drainage
-
Resource Protection Planning Process (RP-3) -- Early / Middle Archaic Study Unit: Middle Ohio River Drainage (1983)
-
Resource Protection Planning Process (RP-3) -- Early Woodland Study Unit: Lower Ohio, Lower Wabash, Green, Middle Ohio, and Salt River Drainages (1983)
-
Resource Protection Planning Process (RP-3) -- Early Woodland Study Unit: Upper Ohio, Miami-Whitewater, Kentucky and Licking River Drainages
-
Resource Protection Planning Process (RP-3) -- Late Archaic Study Unit: Middle Ohio, Green, and Salt River Drainages
-
Resource Protection Planning Process (RP-3) -- Late Archaic Study Unit: Middle Ohio, Green, and Salt River Drainages (1983)
-
Resource Protection Planning Process (RP-3) -- Middle / Late Woodland Study Unit: Middle Ohio River Drainage
-
Resource Protection Planning Process (RP-3) -- Middle / Late Woodland Study Unit: Middle Ohio River Drainage (1983)
-
Resource Protection Planning Process (RP-3) -- Middle Woodland Study Unit: Green, Middle Ohio, Upper Ohio and Salt River Drainages
-
Resource Protection Planning Process (RP-3) -- Middle Woodland Study Unit: Green, Middle Ohio, Upper Ohio and Salt River Drainages (1983)
-
Resource Protection Planning Process (RP-3) -- Middle Woodland Study Unit: Kentucky and Licking River Drainages
-
Resource Protection Planning Process (RP-3) -- Middle Woodland Study Unit: Kentucky and Licking River Drainages (1983)
-
Resource Protection Planning Process (RP-3) -- Mississippian Study Unit: Lower Ohio, Middle Ohio, Lower Wabash and Green River Drainages
-
Resource Protection Planning Process (RP-3) -- Mississippian Study Unit: Lower Ohio, Middle Ohio, Lower Wabash and Green River Drainages (1983)
-
Resource Protection Planning Process -- Early Woodland Study Unit: Lower Ohio, Lower Wabash, Green, Middle Ohio and Salt River Drainages
-
Resource Protection Planning Process -- Early Woodland Study Unit: Upper Ohio, Miami-Whitewater, Kentucky and Licking River Drainages (1983)
-
Resource Protection Planning Process for Texas (1982)
-
A Resource Protection Planning Process Identification Component for the Eastern Washington Protohistoric Study Unit (1987)
-
Resource Protection Planning Process Identification of Prehistoric Archaeological Resources in the Lower Columbia Study Unit (1986)
-
A Resource Protection Planning Process Identification of Prehistoric Archaeological Resources IN the Lower Columbia Study Unit (1986)
-
Resource Protection Planning Process: Southeast Michigan: the Late Woodland Context (1984)
-
Resource Stress and Settlement Pattern Change in the Eastern Mimbres Area, Southwest New Mexico (2009)
-
Resource Structure, Economic Defendability, and Conflict in Rapa Nui and Rapa Iti, East Polynesia – an agent-based modeling approach (2016)
-
Resource Study Proposals (1964)
-
Resource Survey For Rinconada Enterprises Near San Fidel For Rinconada Enterpris (1985)
-
Resource Survey of Properties Located North of Gallup For Santa Fe Mining Inc (1980)
-
Resource Survey Report, Application 26050, Chris Rossi, Emil Rossi and Nick Rossi, P. O. Box 248, Boonville, CA 95415. (California Division of Water Rights) (1980)
-
Resource Team Report for Delta Colorado (1982)
-
Resource Team Report for Durango Colorado (1982)
-
Resource Team Report for Grand Junction Colorado (1982)
-
Resource Team Report for Manitou Springs Colorado (1982)
-
Resource Team Report for Sterling Colorado (1982)
-
Resource Team Report For Waxahachie, Texas (1983)
-
Resource Use and Settlement in the Santa Ynez River Valley (1991)
-
Resource Use and Settlement in the Santa Ynez River Valley : Paleoenvironmental Change (1991)
-
Resource Use and Subsistence in the Vicinity of Proposed Additions To Katmai National Monument (1977)
-
Resource Use and Sustainability of the Gila’s South Diamond Creek Pueblo (2019)
-
Resource Use of Glacier Bay National Preserve (1982)
-
Resource Variability, Risk, and the Structure of Social Netowrks: An Example from the Prehistoric Southwest (1993)
-
Resource, Transportation and the Political Landscape of the Chinese Bronze Age (2018)
-
Resources America Drilling Project (1983)
-
Resources At Los Esteros Lake (1976)
-
Resources Company Kaiparowits Power Project (1992)
-
Resources For the Teaching of Anthropology (1963)
-
Resources Impact Survey for the Mare Tank F-16 Mishap, Sierra County, NM (2016)
-
Resources in Paleopathology (1984)
-
Resources Investment Corp. - Federal #1-28 Well Location and Access Road (1978)
-
Resources Management Plan and Environmental Assessment for Wilson's Creek National Battlefield
-
Resources Management Plan for Chaco Canyon National Monument, San Juan County, New Mexico (1977)
-
Resources Management Plan for Gran Ouivira National Monument (1976)
-
Resources Management Plan for Pecos National Monument (1978)
-
Resources Management Plan, Big Bend National Park, Natural Resources, Cultural Resources (1971)
-
Resources Management Plan: USS Arizona Memorial (1996)
-
Resources Management Program And Natural And Cultural Resources Management Plan for Puuhonua of Honaunau National Historical Park. (National Park Service) (Draft 1975) (1981)
-
Resources Management Program: An Addendum to the Natural and Cultural Resources Management Plan for Pu'uhonua of Honaunau National Historical Park, hawai'i (1981)
-
Resources of Kansas.. (1871)
-
Resources of Northwest Arkansas. Zinc and Lead Mining (1903)
-
Resources of the State of Arkansas, With Description of Counties, Railroads, Mines, and the City of Little Rock (1873)
-
Resources Plan-McKinley Mine For Pittsburg & Midway Coal Mining (1984)
-
Resources Report for Cultural Resources Stikine Area Tongass National Forest, Alp 1986-90 Operating Period Eis (Kuiu Island, Alaska) (1983)
-
Resources Studies on the Ecke Ranch, Encinitas. (1986)
-
Resources Survey and Assessment, Internorth, Inc., Proposed Compressor Station (1981)
-
Resources Twin Buttes Summit Pine Forest Navajo Nation For BIA (1981)
-
Resources, Goals, and Standards: The Basics of Digitizing Archaeological Collections and Legacy Materials (2018)
-
Resources, Mobility, and Cultural Identity in Norse Greenland, Vatnahverfi Project – Report from The Field Work 2008 (field report) (2008)
-
Resources, People and Administrationof Fort Berthold Reservation, North Dakota. USDI / BIA / MRBI (1948)
-
Resources, Technological Traditions, and Social Networks: A Study of Late Neolithic Cooking Vessels in the Lake Taihu Region (2024)
-
Resources, technology and trade in early European metallurgy (1976)
-
Resources, technology, and distribution: a discussion on models of early bronze production in China (2017)
-
Respect Afghan Heritage - Poster (Legacy 06-324) (2006)
-
Respect Egyptian Heritage - Poster (Legacy 06-324) (2006)
-
Respect Iraqi and Afghan Heritage - Poster (Legacy 06-324) (2006)
-
Respectful Rehabilitation Answers to Your Questions About Old Buildings (1982)
-
Respecting the Past and Protecting the Future: Strategies for Implementing Digital Best Practices in Historical Archaeology Research on Military Installations (2019)
-
Respecting the Past, Empowering the Present: NAGPRA, College Students, and Renewed Commitment to Indigenous Heritage (2024)
-
Respecting the Past: Archaeology and Aboriginal Burial Grounds (2014)
-
Respecting the Sacred Power of Indigenous Collections and Museum Staff (2024)
-
Respiratory Disease Among Protohistoric and Early Historic Plains Indians (1994)
-
Responding to Burning Libraries (2017)
-
Responding to Climate Change Threats to Archaeology through the World Heritage Convention (2019)
-
Responding to Regional Collapse: A Late Mississippian Community on the Georgia Coast (2016)
-
Response By Wcrm To a Request for Additional Information To Determine Eligibility of the Ladd Canyon Site (Temporary #C-178-3) in Union County, Oregon For Inclusion In the National Register of Historic Places (1980)
-
Response Draft from Scott Shepherd to Cantu, Building 907 Doors at North and South Basement Entrances, Randolph Air Force Base, Texas (2008)
-
Response Draft from Scott Shepherd to Moore, Building 907 Screen Guards, Randolph Air Force Base, Texas (2008)
-
Response from 902 MSG/CEAN to 12 MSG/CEO, Exterior Awnings Hangar 62, Randolph Air Force Base, Texas (2011)
-
Response from Amy Dase to Joseph Logan, AF Building 208, Randolph Air Force Base, Texas (1992)
-
Response from Amy Dase to Joseph Logan, Building 675, Randolph Air Force Base, Texas (1992)
-
Response from Brian Miller to Claudia Nissley, Off-Street Parking Areas, Randolph Air Force Base, Texas (1996)
-
Response from Brian Miller to Claudia Nissley, Off-Street Parking Areas, Randolph Air Force Base, Texas (1996)
-
Response from Brian Miller to Claudia Nissley, Pre-cast Concrete Fence Plan, Randolph Air Force Base, Texas (1996)
-
Response from Brian Miller to Curtis Tunnell, Pre-cast Concrete Fence Plan, Randolph Air Force Base, Texas (1996)
-
Response from Brian Miller to Curtis Tunnell, Request for Reconsideration of Determination for Off-Street Parking Area, Randolph Air Force Base, Texas (1996)
-
Response from Caroline Wright to David Brigham, Project Review of the Proposed Work at Camp Bullis, Bexar County, Texas (2008)
-
Response from Caroline Wright to James Graham, Proposed Deconstruction of Building 293, Fort Sam Houston, Texas (2010)
-
Response from Caroline Wright to Leon Spradling, Project Review for New Static Airplane Display, Randolph Air Force Base, Texas (2010)
-
Response from Claudia Nissley to Donald Peterson, Rehabilitation of Building 216, Randolph Air Force Base, Texas (1992)
-
Response from Claudia Nissley to Donald Peterson, Rehabilitation of Building 661, Randolph Air Force Base, Texas (1992)
-
Response from Claudia Nissley to Donald Peterson, Rehabilitation of Building 901, Randolph Air Force Base, Texas (1992)
-
Response from Claudia Nissley to Donald Peterson, Rehabilitation of Building 902, Randolph Air Force Base, Texas (1992)
-
Response from Claudia Nissley to Donald Peterson, Rehabilitation of Building 902, Randolph Air Force Base, Texas (1992)
-
Response from Claudia Nissley to Harry Finke, Replacement of Windows Buildings 661 and 675, Randolph Air Force Base, Texas (1992)
-
Response from Claudia Nissley to Joseph Logan, Interior Rehabilitation of Hangar 12, Randolph Air Force Base, Texas (1992)
-
Response from Claudia Nissley to Joseph Logan, Proposed Rehabilitation of Building 208, Randolph Air Force Base, Texas (1992)
-
Response from Claudia Nissley to Joseph Logan, Proposed Rehabilitation of Building 663, Randolph Air Force Base, Texas (1992)
-
Response from Claudia Nissley to Joseph Logan, Proposed Rehabilitation of North Wing Building 661, Randolph Air Force Base, Texas (1993)
-
Response from Claudia Nissley to Joseph Logan, Rehabilitation of Building 216, Randolph Air Force Base, Texas (1992)
-
Response from Claudia Nissley to Joseph Logan, Rehabilitation of Building 675 A Wing, Randolph Air Force Base, Texas (1992)
-
Response from Claudia Nissley to Joseph Logan, Rehabilitation of Hangar 13, Randolph Air Force Base, Texas (1992)
-
Response from Claudia Nissley to Joseph Logan, Window Replacement Project Building 661, Randolph Air Force Base, Texas (1991)
-
Response from Claudia Nissley to Richard Booher, Proposed Cleaning and Stabilization of Building 614, Fort Sam Houston, Texas (1991)
-
Response from Curtis Tunnell to Elton Prewitt, Camp Bullis Investigations, Report, and Related Correspondence, Camp Bullis, Texas (1990)
-
Response from Demetrio Jimenez to Emmitt Smith, Building 526, Randolph Air Force Base, Texas (1993)
-
Response from Demetrio Jimenez to Emmitt Smith, Building 581, Randolph Air Force Base, Texas (1993)
-
Response from Demetrio Jimenez to Emmitt Smith, Building 661, Randolph Air Force Base, Texas (1993)
-
Response from Demetrio Jimenez to John Brenneman, Armory Building Construction, Camp Bullis, Texas (1994)
-
Response from Demetrio Jimenez to John Brenneman, Building 131 50 Percent Level Plans, Fort Sam Houston, Texas (1994)
-
Response from Demetrio Jimenez to John Brenneman, Building 2194 Water Plant, Fort Sam Houston, Texas (1994)
-
Response from Demetrio Jimenez to John Brenneman, Building 2792 Wallpaper and Paint, Fort Sam Houston, Texas (1994)
-
Response from Demetrio Jimenez to John Brenneman, Buildings 122, 124, and 125, Fort Sam Houston, Texas (1994)
-
Response from Demetrio Jimenez to John Brenneman, Ceiling Fans in Fifteen Quarters on Staff Post, Fort Sam Houston, Texas (1994)
-
Response from Demetrio Jimenez to John Brenneman, Design of Eisenhower National Bank 95 Percent Plans, Fort Sam Houston, Texas (1994)
-
Response from Demetrio Jimenez to John Brenneman, Design of Eisenhower National Bank, Fort Sam Houston, Texas (1993)
-
Response from Demetrio Jimenez to John Brenneman, Form 1391 for Building 2376 Beach Pavilion, Fort Sam Houston, Texas (1994)
-
Response from Demetrio Jimenez to John Brenneman, Officers' Club Alterations Proposal, Fort Sam Houston, Texas (1994)
-
Response from Demetrio Jimenez to John Brenneman, Raven Room Canopy Installation, Fort Sam Houston, Texas (1994)
-
Response from Demetrio Jimenez to John Brenneman, Temporary Building, Fort Sam Houston, Texas (1994)
-
Response from Department of the Air Force to Naval Civilian Personnel Data System Center, Confirmation of Initial Request for Construction of Additional Office Space, Randolph Air Force Base, Texas (1991)
-
Response from Department of the Air Force to Naval Civilian Personnel Data System Center, Initial Request for Construction of Additional Office Space, Randolph Air Force Base, Texas (1991)
-
Response from Don Klima to John Brenneman, Demolition and Replacement of Building 2791, Fort Sam Houston, Texas (1997)
-
Response from Don Klima to John Brenneman, Demolition of Building 238, Fort Sam Houston, Texas (1997)
-
Response from Don Klima to Leonard Patrick, Building 900 Construction of Exterior Elevator, Randolph Air Force Base, Texas (2000)
-
Response from Donald Peterson to Curtis Tunnell, Building 902 Alterations, Randolph Air Force Base, Texas (1991)
-
Response from Donald Peterson to Curtis Tunnell, Renovation of Building 902, Randolph Air Force Base, Texas (1992)
-
Response from Douglas Biggerstaff to Lawerence Oaks, Lease of Building 259, Fort Sam Houston, Texas (2002)
-
Response from Elizabeth Butman to Michael Grizer, Project Review of Proposed Rehabilitation of Building 133, Fort Sam Houston, Texas (2012)
-
Response from Elton Prewitt to James Steely, PAI Reports of Investigations No. 75, Camp Bullis, Texas (1990)
-
Response from Emmitt Smith to Curtis Tunnell, Building 526, Randolph Air Force Base, Texas (1993)
-
Response from F. Lawerence Oaks to Allen Benefield, Project Review for Cold War-Era Building and Structure Inventory and Assessment, Randolph Air Force Base, Texas (2003)
-
Response from F. Lawerence Oaks to Bruce R. Nadler, Project Review of New Canopy and Alterations to Hangar 63, Randolph Air Force Base, Texas (2004)
-
Response from F. Lawerence Oaks to Colonel Patrick, Project Review of Flagstone Sidewalks, Randolph Air Force Base, Texas (1999)
-
Response from F. Lawerence Oaks to David Brigham, Project Review Determination for Rehabilitation of Building 128 (2002)
-
Response from F. Lawerence Oaks to David Brigham, Project Review for Rehabilitation of Building 128, Fort Sam Houston, Texas (2002)
-
Response from F. Lawerence Oaks to David Brigham, Project Review for Rehabilitation of Building 2000-2001, Fort Sam Houston, Texas (2002)
-
Response from F. Lawerence Oaks to David Brigham, Project Review for Rehabilitation of Building 2264, Fort Sam Houston, Texas (2002)
-
Response from F. Lawerence Oaks to David Brigham, Project Review for Rehabilitation of Theatre 1 Building 2270, Fort Sam Houston, Texas (2002)
-
Response from F. Lawerence Oaks to David Brigham, Project Review Revise for Rehabilitation of Building 2000-2001, Fort Sam Houston, Texas (2002)
-
Response from F. Lawerence Oaks to David Brigham, Rehabilitation of Building 128, Fort Sam Houston, Texas (2003)
-
Response from F. Lawerence Oaks to Douglas A. Biggerstaff, Project Review for the Lease of Buildings 1000, 2371, and 2372, Fort Sam Houston, Texas (2003)
-
Response from F. Lawerence Oaks to Douglas Biggerstaff, Draft Memorandum of Agreement for the Demolition of Buildings 376, 377, 4115, and 5102, Fort Sam Houston and Camp Bullis, Texas (2001)
-
Response from F. Lawerence Oaks to Douglas Biggerstaff, Environmental Assessment Document for New Housing Construction in Patch-Chaffee Area, Fort Sam Houston, Texas (2000)
-
Response from F. Lawerence Oaks to Douglas Biggerstaff, Memorandum of Agreement Building 5002, Camp Bullis, Fort Sam Houston, Texas (2002)
-
Response from F. Lawerence Oaks to Douglas Biggerstaff, MOA on Demolition of Building 1030, Fort Sam Houston, Texas (2000)
-
Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review for Building 1030 HABS Documentation, Fort Sam Houston, Texas (2003)
-
Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review for Construction of Dining Facility within Conservation District, Fort Sam Houston, Texas (2001)
-
Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review for NEPA Final Draft Including Proposed Demolition of Buildings 238 and 240, Fort Sam Houston, Texas (2003)
-
Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review for Pending Environmental Assessment of Proposed Access Control Measures, Fort Sam Houston, Texas (2003)
-
Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review for Proposed Demolition of Buildings 238 and 240, Fort Sam Houston, Texas (2003)
-
Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review for Proposed New Bollards to Replace Temporary Barriers, Fort Sam Houston, Texas (2003)
-
Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review for Proposed Security Gate in Old Austin Road/Dickman Area, Fort Sam Houston, Texas (2003)
-
Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review for Proposed Security Gate in Old Austin Road/Dickman Area, Fort Sam Houston, Texas (2003)
-
Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review for Proposed Switching Facility in Expanded NHL District, Fort Sam Houston, Texas (2003)
-
Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review for Proposed Undertaking to Demolish Building 5101, Camp Bullis, Fort Sam Houston, Texas (2002)
-
Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review for Proposed Undertaking to Demolish Buildings 5101 and 5002, Camp Bullis, Fort Sam Houston, Texas (2002)
-
Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review of Rehabilitation of Building 2264, Fort Sam Houston, Texas (2001)
-
Response from F. Lawerence Oaks to Douglas Biggerstaff, Project Review of Report for the Stabilization of the Gift Chapel Building 2200, Fort Sam Houston, Texas (2000)
-
Response from F. Lawerence Oaks to Douglas Biggerstaff, Proposal for Privatization of Water Supply of Fort Sam Houston and Camp Bullis, Texas (2000)
-
Response from F. Lawerence Oaks to Douglas Biggerstaff, Proposed Demolition of Buildings 238 and 240, Fort Sam Houston, Texas (2002)
-
Response from F. Lawerence Oaks to Douglas Biggerstaff, Review of Lease Agreement for Building 259, Fort Sam Houston, Texas (2002)
-
Response from F. Lawerence Oaks to Douglas Biggerstaff, Review of Lease Agreement for Building 259, Fort Sam Houston, Texas (2003)
-
Response from F. Lawerence Oaks to Douglas Biggerstaff, Review of Lease Agreements for Brooke Army Medical Center and Beach Pavilion North and South Buildings, Fort Sam Houston, Texas (2002)
-
Response from F. Lawerence Oaks to Garry Atkins, Project Review for 65 Percent Construction Document Submittal for Proposed Rehabilitation of Building 2270 Theater 1, Fort Sam Houston, Texas (2005)
-
Response from F. Lawerence Oaks to Garry Atkins, Project Review for Proposed Demolition of Building 330 Due to PCE Contamination, Fort Sam Houston, Texas (2005)
-
Response from F. Lawerence Oaks to Garry Atkins, Project Review for Proposed Demolition of Building 330 Due to PCE Contamination, Fort Sam Houston, Texas (2005)
-
Response from F. Lawerence Oaks to Garry Atkins, Project Review for Proposed Rehabilitation of Family Housing Unit Types, Fort Sam Houston, Texas (2005)
-
Response from F. Lawerence Oaks to Garry Atkins, Project Review for Use of Building 6202, 6203, 6204 Officer's Quarters for MUAC Training, Camp Bullis, Texas (2004)
-
Response from F. Lawerence Oaks to Jack Higgins, Project Review for Building 601 and 602 Rehabilitation, Fort Sam Houston, Texas (2001)
-
Response from F. Lawerence Oaks to Jackie Schatter, Project Review for the Addition of a Canopy at Building 368, Fort Sam Houston, Texas (2001)
-
Response from F. Lawerence Oaks to Jackie Schlatter, Further Project Review on Karst Research at Camp Bullis, Texas (2000)
-
Response from F. Lawerence Oaks to Jackie Schlatter, Project Review for Draft of Integrated Cultural Resource Management Plan, Fort Sam Houston and Camp Bullis, Texas (2001)
-
Response from F. Lawerence Oaks to James Graham, Project Review for Proposed Rehabilitation of Officers’ Club for Use as an RC1 Community Center, Fort Sam Houston, Texas (2006)
-
Response from F. Lawerence Oaks to John Brenneman, Continued Project Review to Replace Windows in Building 2792, Fort Sam Houston, Texas (2000)
-
Response from F. Lawerence Oaks to John Brenneman, Preconcept Proposal for Repair Windows Building 2792, Fort Sam Houston, Texas (1999)
-
Response from F. Lawerence Oaks to John Brenneman, Project Review for Building 4019, Fort Sam Houston, Texas (1999)
-
Response from F. Lawerence Oaks to John Brenneman, Project Review for Draft Preservation Assessment of the Beach Pavilion, Fort Sam Houston, Texas (1999)
-
Response from F. Lawerence Oaks to John Brenneman, Project Review for Plan to Stabilize Building 2200 Gift Chapel, Fort Sam Houston, Texas (2000)
-
Response from F. Lawerence Oaks to John Brenneman, Project Review for Replacement of Aluminum Windows in Building 2792, Fort Sam Houston, Texas (2000)
-
Response from F. Lawerence Oaks to John Brenneman, Project Review for Structural Repairs to Buildings 104, 114, 116, 121A-D, 167, and 172A-D Officer’s Quarters and Artillery Post, Fort Sam Houston, Texas (1999)
-
Response from F. Lawerence Oaks to John Brenneman, Project Review of Annual Report, Fort Sam Houston, Texas (1999)
-
Response from F. Lawerence Oaks to John Brenneman, Project Review of Parking Pads Near Buildings 2279-2284, Fort Sam Houston, Texas (1999)
-
Response from F. Lawerence Oaks to John Brenneman, Project Review to Replace Windows in Building 2792, Fort Sam Houston, Texas (1999)
-
Response from F. Lawerence Oaks to John Brenneman, Project Review to Replace Windows in Building 2792, Fort Sam Houston, Texas (2000)
-
Response from F. Lawerence Oaks to John Brenneman, Replace Windows in Building 2376 Correction, Fort Sam Houston, Texas (2000)
-
Response from F. Lawerence Oaks to John Brenneman, Update on Project Review to Replace Windows in Building 2792, Fort Sam Houston, Texas (2000)
-
Response from F. Lawerence Oaks to Martha Sanders, Project Review for Draft Report: Cultural Resources Survey of 4423 Acres and National Register Testing at Five Prehistoric Sites, Camp Bullis, Texas (2002)
-
Response from F. Lawerence Oaks to Martha Sanders, Project Review of Revised Draft Report: Cultural Resources Survey of 4423 Acres and National Register Testing at Five Prehistoric Sites, Camp Bullis, Texas (2002)
-
Response from F. Lawerence Oaks to Martha Sanders, Proposed Review for New Housing Units in Patch-Chaffee Housing Area, Fort Sam Houston, Texas (2003)
-
Response from F. Lawerence Oaks to Stephen Austin, Draft Scope of Work: Inventory for Cultural Hydrogeologic and Biological Resources Associated with Upper Glen Rose Caves and Karst Features, 2000-2001 Season at Camp Bullis Military Reservation, San Antonio, Texas (2000)
-
Response from F. Lawerence Oaks to Wendy Martinson, Project Review for Draft EA and FONSI for Proposed Consolidated Dining Facility, Camp Bullis, Texas (2005)
-
Response from F. Lawerence Oaks to William Fickel, Project Review for Karst Research at Camp Bullis, Texas (2000)
-
Response from F. Lawerence Oaks to William Thresher, Project Review of Demolition of Buildings 4226 and 2013-2017 Beebe Loop, Fort Sam Houston, Texas (1999)
-
Response from F. Lawerence Oaks to William Thresher, Project Review Under Section 106 of the National Historic Preservation Act of 1966, Demolition and Selective Demolition Proposals, Fort Sam Houston, Texas (1999)
-
Response from F. Lawerence Oaks to William Thresher, Rehabilitation of Building 1026, Fort Sam Houston, Texas (1999)
-
Response from F. Lawerence Oaks to William Thresher, Tour Thank You, Fort Sam Houston, Texas (1998)
-
Response from F. Lawrence Oaks to Allen Benefield, Buildings 200 and 671 Alterations Without Prior Consultation, Randolph Air Force Base, Texas (2002)
-
Response from F. Lawrence Oaks to Leonard Patrick, Proposed Elevator Building 900, Randolph Air Force Base, Texas (1999)
-
Response from F. Lawrence Oaks to Richard Trevino, Project Review of Proposed Construction of Vestibule and Windows at Hangar 64, Randolph Air Fore Base, Texas (2006)
-
Response from Gary Vest to John Harper, Foreclosure of Undertakings for Buildings 902, 216, 661, and 675, Randolph Air Force Base, Texas (1993)
-
Response from Harry Finke to Curtis Tunnell, Rehabilitation of Building 675 C, Randolph Air Force Base, Texas (1992)
-
Response from Jackie Schlatter to Mike Johnson, Fort Sam Houston ICRMP Discussion, Fort Sam Houston, Texas (2000)
-
Response from James Bruseth and Timothy Perttula to William Fickel, Camp Bullis Cultural Resource Management Plan, Fort Sam Houston, Texas (1994)
-
Response from James Bruseth and Timothy Perttula to William Fickel, Final Prehistoric Research Context for Camp Bullis and Fort Sam Houston, Texas (1994)
-
Response from James Bruseth and Timothy Perttula, Comments on Prehistoric Research Context for Camp Bullis and Fort Sam Houston, Bexar and Comal Counties, Texas in Partial Fulfillment of the Programmatic Agreement (1993)
-
Response from James Bruseth to Cornelius Allen, Programmatic Agreement, Fort Sam Houston and Camp Bullis, Texas (1988)
-
Response from James Bruseth to Lisa Orlando, U.S. Army Institute of Surgical Research, Fort Sam Houston, Texas (1997)
-
Response from James Bruseth to Michael Ensch, Draft Report: A Cultural Resources Survey of Camp Bullis, Bexar County, Texas: The 1996 Season, Camp Bullis, Texas (1998)
-
Response from James Bruseth to Michael Mocek, Draft Report of Archaeological Survey, Camp Bullis, Texas (1990)
-
Response from James Graham to Emily Payne, Amendment to the Memorandum of Agreement for Building 330, Fort Sam Houston, Texas (2005)
-
Response from James Steely and Stanley Graves to John Brenneman, Roof Replacement at Building 4192, Fort Sam Houston, Texas (1993)
-
Response from James Steely and Stanley Graves to William Fickel, Building 371 Comments, Fort Sam Houston, Texas (1993)
-
Response from James Steely to Joseph Logan, Building 156, Randolph Air Force Base, Texas (1993)
-
Response from Jessica Villarreal to Dee Brame, Alter Repair and Remove Asbestos Building 901, Randolph Air Force Base, Texas (1992)
-
Response from John Harper to Donald Rice, Rehabilitation of Buildings 902, 216, 661, and 675, Randolph Air Force Base, Texas (1992)
-
Response from Joseph Logan to Claudia Nissley, Rehabilitation of Building 216, Randolph Air Force Base, Texas (1992)
-
Response from Joseph Logan to Claudia Nissley, Rehabilitation of Building 675 A Wing, Randolph Air Force Base, Texas (1992)
-
Response from Joseph Logan to Claudia Nissley, Rehabilitation of Building 902, Randolph Air Force Base, Texas (1992)
-
Response from Joseph Logan to Claudia Nissley, Rehabilitation of Hangar 12 Interior, Randolph Air Force Base, Texas (1992)
-
Response from Joseph Logan to Claudia Nissley, Rehabilitation of Hangars 12, 13, and 64, Randolph Air Force Base, Texas (1992)
-
Response from Joseph Logan to Claudia Nissley, Window Replacement at Building 661, Randolph Air Force Base, Texas (1991)
-
Response from Joseph Logan to Curtis Tunnell, Adverse Effect Building 901, Randolph Air Force Base, Texas (1992)
-
Response from Joseph Logan to Curtis Tunnell, Building 598 Patio Tile Replacement, Randolph Air Force Base, Texas (1992)
-
Response from Joseph Logan to Curtis Tunnell, Building 675 A Wing, Randolph Air Force Base, Texas (1992)
-
Response from Joseph Logan to Curtis Tunnell, Hangar 12 Interior Work, Randolph Air Force Base, Texas (1992)