San Carlos Irrigation and Drainage District (SCIDD) Rehabilitation Project


Resources Inside This Collection (Viewing 1-51 of 51)

China Wash Flume Historic American Engineering Record, Pinal County, Arizona
  • China Wash Flume Historic American Engineering Record, Pinal County, Arizona
    PROJECT Greta Rayle. USDI Bureau of Reclamation, Phoenix Area Office.

    The San Carlos Irrigation and Drainage District (SCIDD) is undertaking a 10-year Rehabilitation project of the National Register of Historic Places (NRHP)-eligible Florence-Casa Grande (FCG) Canal (also known as the Main Canal/AZ AA:3:215[ASM]) in Pinal County, Arizona. The canal, which is currently operated and maintained by SCIDD, was constructed by the U.S. Bureau of Indian Affairs and Bureau of Reclamation (Reclamation) between 1923 and 1928 and incorporated into the San Carlos Irrigation...

  • China Wash Flume Documentation Report (2016)
    DOCUMENT Full-Text Greta Rayle. Helana Ruter.

    The San Carlos Irrigation and Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of the National Register of Historic Places (NRHP)-eligible Florence-Casa Grande (FCG) Canal (also known as the Main Canal/AZ AA:3:215[ASM]) in Pinal County, Arizona. The canal, which is currently operated and maintained by SCIDD, was constructed by the U.S. Bureau of Indian Affairs (BIA) and Bureau of Reclamation (Reclamation) between 1923 and 1928 and incorporated into the San Carlos...

  • China Wash Flume Historic American Engineering Record GIS (2016)
    GEOSPATIAL C. Ferguson.

    Project area boundary for China Wash Flume HAER Documentation

  • Historic American Engineering Record: China Wash Flume (2016)
    DOCUMENT Full-Text Greta Rayle. Helana Ruter.

    The San Carlos Irrigation and Drainage District (SCIDD) is undertaking a 10-year rehabilitation project (project) of the National Register of Historic Places (NRHP) eligible Florence-Casa Grande (FCG) Canal (also known as the Main Canal/ AZ AA:3:215[ASM]) in Pinal County, Arizona. The canal, which is currently operated and maintained by SCIDD, was constructed by the U.S. Bureau of Indian Affairs (BIA) and Bureau of Reclamation (Reclamation) between 1923 and 1928 and incorporated into the San...

Class I (Overview) Survey Update of the San Carlos Irrigation Drainage District (SCIDD) Joint Works for the U.S. Bureau of Reclamation, Pinal County, Arizona Class III (Intensive) Cultural Resource Survey of 458 Acres of Federal and Private Land for Proposed Construction and Operations of a Sediment Removal Pond and Storage Area Below Ashurst-Hayden Diversion Dam, Florence, Pinal County, Arizona Class III Survey of Expanded Area of Potential Effect for the San Carlos Irrigation Project Rehabilitation of Reaches 1, 2, and 3 A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation
  • A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation
    PROJECT David Doyel. USDI Bureau of Reclamation, Phoenix Area Office.

    The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...

  • A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation: Report (1995)
    DOCUMENT Full-Text David Doyel. Joseph Crary. Gina Gage. Karolyn Jackman Jensen.

    The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...

Cultural Resources Investigations along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Florence, Arizona Final Report of Class III Cultural Resource Survey for the SCIDD-Florence Canal, Phase I
  • Final Report of Class III Cultural Resource Survey for the SCIDD-Florence Canal, Phase I
    PROJECT USDI Bureau of Reclamation, Phoenix Area Office.

    As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The Bureau of Reclamation, Phoenix Area Office (Reclamation) directed Archaeological Consulting...

  • Addendum Report to the Class III Survey Along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation: Report (2014)
    DOCUMENT Full-Text Joanne C. Tactikos.

    As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The Bureau of Reclamation, Phoenix Area Office (Reclamation) directed Archaeological Consulting...

  • Final Report of Class III Cultural Resource Survey for the SCIDD Florence Canal, Phase I: Station 45+00 to 1224+00, Pinal County, Arizona: Photo Log (2012)
    DOCUMENT Full-Text Archaeological Consulting Services, Ltd..

    As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The Bureau of Reclamation, Phoenix Area Office (Reclamation) directed Archaeological Consulting...

  • Final Report of Class III Cultural Resource Survey for the SCIDD Florence Canal, Phase I: Station 45+00 to 1224+00, Pinal County, Arizona: Photos (2011)
    IMAGE Archaeological Consulting Services, Ltd.. E. M. Ryan. Linda Schilling. Thomas E. Jones.

    As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The Bureau of Reclamation, Phoenix Area Office (Reclamation) directed Archaeological Consulting...

  • Final Report of Class III Cultural Resource Survey for the SCIDD Florence Canal, Phase I: Station 45+00 to 1224+00, Pinal County, Arizona: Report (2012)
    DOCUMENT Full-Text Melanie Ryan. Thomas E. Jones. Robert Stokes.

    As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The Bureau of Reclamation, Phoenix Area Office (Reclamation) directed Archaeological Consulting...

Phase 1 Data Testing at AZ U:15:1(REC) on Private Land and Mapping of Historic Architecture at AZ AA:3:215(ASM) and AZ U:16:303(ASM) on Federal Land near Ashurst-Hayden Diversion Dam, Pinal County, Arizona Phase 1 Eligibility Testing, Data Recovery, and Archival Research along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Pinal County, Arizona Phase 2 Data Recovery at AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona