San Carlos Irrigation Project (SCIP), Bureau of Indian Affairs


Resources Inside This Collection (Viewing 1-57 of 57)

China Wash Flume Historic American Engineering Record, Pinal County, Arizona
  • China Wash Flume Historic American Engineering Record, Pinal County, Arizona
    PROJECT Greta Rayle. USDI Bureau of Reclamation, Phoenix Area Office.

    The San Carlos Irrigation and Drainage District (SCIDD) is undertaking a 10-year Rehabilitation project of the National Register of Historic Places (NRHP)-eligible Florence-Casa Grande (FCG) Canal (also known as the Main Canal/AZ AA:3:215[ASM]) in Pinal County, Arizona. The canal, which is currently operated and maintained by SCIDD, was constructed by the U.S. Bureau of Indian Affairs and Bureau of Reclamation (Reclamation) between 1923 and 1928 and incorporated into the San Carlos Irrigation...

  • China Wash Flume Documentation Report (2016)
    DOCUMENT Full-Text Greta Rayle. Helana Ruter.

    The San Carlos Irrigation and Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of the National Register of Historic Places (NRHP)-eligible Florence-Casa Grande (FCG) Canal (also known as the Main Canal/AZ AA:3:215[ASM]) in Pinal County, Arizona. The canal, which is currently operated and maintained by SCIDD, was constructed by the U.S. Bureau of Indian Affairs (BIA) and Bureau of Reclamation (Reclamation) between 1923 and 1928 and incorporated into the San Carlos...

  • China Wash Flume Historic American Engineering Record GIS (2016)
    GEOSPATIAL C. Ferguson.

    Project area boundary for China Wash Flume HAER Documentation

  • Historic American Engineering Record: China Wash Flume (2016)
    DOCUMENT Full-Text Greta Rayle. Helana Ruter.

    The San Carlos Irrigation and Drainage District (SCIDD) is undertaking a 10-year rehabilitation project (project) of the National Register of Historic Places (NRHP) eligible Florence-Casa Grande (FCG) Canal (also known as the Main Canal/ AZ AA:3:215[ASM]) in Pinal County, Arizona. The canal, which is currently operated and maintained by SCIDD, was constructed by the U.S. Bureau of Indian Affairs (BIA) and Bureau of Reclamation (Reclamation) between 1923 and 1928 and incorporated into the San...

Class I (Overview) Survey Update of the San Carlos Irrigation Drainage District (SCIDD) Joint Works for the U.S. Bureau of Reclamation, Pinal County, Arizona Class III (Intensive) Cultural Resource Survey of 458 Acres of Federal and Private Land for Proposed Construction and Operations of a Sediment Removal Pond and Storage Area Below Ashurst-Hayden Diversion Dam, Florence, Pinal County, Arizona Class III Survey of Expanded Area of Potential Effect for the San Carlos Irrigation Project Rehabilitation of Reaches 1, 2, and 3 A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation
  • A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation
    PROJECT David Doyel. USDI Bureau of Reclamation, Phoenix Area Office.

    The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...

  • A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation: Report (1995)
    DOCUMENT Full-Text David Doyel. Joseph Crary. Gina Gage. Karolyn Jackman Jensen.

    The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...

Cultural Resources Investigations along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Florence, Arizona Final Report of Class III Cultural Resource Survey for the SCIDD-Florence Canal, Phase I
  • Final Report of Class III Cultural Resource Survey for the SCIDD-Florence Canal, Phase I
    PROJECT USDI Bureau of Reclamation, Phoenix Area Office.

    As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The Bureau of Reclamation, Phoenix Area Office (Reclamation) directed Archaeological Consulting...

  • Addendum Report to the Class III Survey Along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation: Report (2014)
    DOCUMENT Full-Text Joanne C. Tactikos.

    As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The Bureau of Reclamation, Phoenix Area Office (Reclamation) directed Archaeological Consulting...

  • Final Report of Class III Cultural Resource Survey for the SCIDD Florence Canal, Phase I: Station 45+00 to 1224+00, Pinal County, Arizona: Photo Log (2012)
    DOCUMENT Full-Text Archaeological Consulting Services, Ltd..

    As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The Bureau of Reclamation, Phoenix Area Office (Reclamation) directed Archaeological Consulting...

  • Final Report of Class III Cultural Resource Survey for the SCIDD Florence Canal, Phase I: Station 45+00 to 1224+00, Pinal County, Arizona: Photos (2011)
    IMAGE Archaeological Consulting Services, Ltd.. E. M. Ryan. Linda Schilling. Thomas E. Jones.

    As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The Bureau of Reclamation, Phoenix Area Office (Reclamation) directed Archaeological Consulting...

  • Final Report of Class III Cultural Resource Survey for the SCIDD Florence Canal, Phase I: Station 45+00 to 1224+00, Pinal County, Arizona: Report (2012)
    DOCUMENT Full-Text Melanie Ryan. Thomas E. Jones. Robert Stokes.

    As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The Bureau of Reclamation, Phoenix Area Office (Reclamation) directed Archaeological Consulting...

Individual Resources
  • Archaeological Survey in Districts 6 and 7, Gila River Indian Community (1997)
    DOCUMENT Full-Text Uploaded by: Claudine Gravel-Miguel

    Archaeological Consulting Services,Ltd. (ACS) conducted archaeological investigations on the Gila River Indian Community in 1995 and 1996. More than 10,000 acres were in the project area, and 85 sites were recorded. Because the area had been used for agriculture, much land had been plowed. Volume 1 provides an overall picture of the project including the culture history and previous research done in the Middle Gila River Valley, followed by a description of our research orientation, and the...

  • An Archaeological Survey in the Blackwater Area, Volume 1: The History of Human Settlement in the Blackwater Area (1994)
    DOCUMENT Full-Text David A. Gregory. Gary Huckleberry.

    The Bureau of Reclamation (Reclamation), United States Department of the Interior, was in the initial stages of the Water Management Project designed to bring Central Arizona Project water to the Gila River Indian Community (GRIC). Under terms of a contract signed in 1992 with the GRIC, facilities designed and constructed by Reclamation would deliver 173,000 acre-feet of water annually onto the reservation. Federal law mandates consideration of potential impacts of such projects upon cultural...

  • An Archaeological Survey in the Blackwater Area, Volume 2: Site Descriptions and Related Data (1994)
    DOCUMENT Full-Text David A. Gregory. Diane L. Douglas.

    The Bureau of Reclamation (Reclamation), United States Department of the Interior, was in the initial stages of the Water Management Project designed to bring Central Arizona Project water to the Gila River Indian Community (GRIC). Under terms of a contract signed in 1992 with the GRIC, facilities designed and constructed by Reclamation would deliver 173,000 acre-feet of water annually onto the reservation. Federal law mandates consideration of potential impacts of such projects upon cultural...

  • Historic American Engineering Record: Coolidge Dam, Pinal County, Arizona (1986)
    DOCUMENT Full-Text David M. Introcaso.

    Historic American Engineering Record (HAER) No. AZ-7 presents a written historical summary and relevant historical documentation about the construction and use of the Coolidge Dam, which impounds water along the Gila River to form the San Carlos Reservoir 30 miles southwest of Globe, Arizona. It also contains a summary of Gila River water usage and conflicts over water access, from native Pima and Maricopa water use to Historic era, multi-community uses. The report contains a narrative...

  • Historic American Engineering Record: San Carlos Irrigation Project, North and South of Gila River, Vicinity of Coolidge, Pinal County, Arizona (1996)
    DOCUMENT Full-Text Christine Pfaff.

    Historic American Engineering Record (HAER) No. AZ-50 presents a written historical summary and relevant historical documentation about the construction and use history of San Carlos Irrigation Project (SCIP) waterways and features, which deliver Gila River water to central and southern Arizona for agriculture, industrial, and residential uses. The report contains a narrative description, photographs, drawings, and maps. Authorized under the San Carlos Act (43 Stat.475), SCIP is a joint...

  • Research Design and Work Plan for Archaeological Survey on the Gila River Indian Community (1995)
    DOCUMENT Full-Text David E. Doyel. Margerie Green.

    The Water Management Project (WMP) was developed to bring Central Arizona Project (CAP) water to the Gila River Indian Community (GRIC). Under terms of a contract signed in 1992 with the GRIC, facilities designed and constructed by the Bureau of Reclamation would deliver 173,000 acre-feet of water annually onto the reservation. In anticipation of project construction, Reclamation directed Archaeological Consulting Services, Ltd. to develop a research design for cultural resource investigations...

Phase 1 Data Testing at AZ U:15:1(REC) on Private Land and Mapping of Historic Architecture at AZ AA:3:215(ASM) and AZ U:16:303(ASM) on Federal Land near Ashurst-Hayden Diversion Dam, Pinal County, Arizona Phase 1 Eligibility Testing, Data Recovery, and Archival Research along Reaches 1 and 2 of the San Carlos Irrigation Project Rehabilitation, Pinal County, Arizona Phase 2 Data Recovery at AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona